Specifications

10
170314-20 ALT5
Firebrick Installation
This package contains 18 full-size  rebricks, as well as 3 various cut bricks.
With the woodstove in the upright position, install  rebricks as follows:
1. Place  rebricks on the bottom of the unit  rst. Use a total of 6 full (D) and
3 cut bricks (A, B & C)
2. Install 4 full-size bricks on each side of the  rebox as shown.
3. Install 3 full-size  rebricks against the rear wall.
ITEM SIZE
A 38mm X 114mm X 32mm
B 102mm X 114mm X 32mm
C 184mm X 114mm X 32mm
D 229mm X 114mm X 32mm
A
B
C
D