Installation Procedure – Mobile Home
CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL
AND CEILING/ROOF MUST BE MAINTAINED.
Note: See "Combustion Air" section on page 11
1. Position stove and  oor protection with hole for combustion air in accordance with the
clearances as stated on the label and in Figure #3.
2. Mark the position for the hole in the ceiling and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with  oor joists, ceiling joists or rafters
before proceeding further.
4. Cut a hole in the ceiling and roof to suit the chimney system and frame in the sides. The
chimney support is mounted to the framing.
5. Assemble chimney sections so the  nished length is resting on the support and protruding
through the roof. Avoid having joints between ceiling and roof. Install radiation shield.
Assemble  ashing and storm collar and be sure to maintain the vapour barrier at this
point. (Seal securely.) Attach rain cap and check  ashing for leaks.
5. Install connector as per manufacturer's instructions.
6. To attach stove to  oor,  rst remove the leveling bolts from the legs. Then attach stove
to  ooring using two 1/4" x 2" or longer lag screws through the leveling bolt holes.
Follow chimney and chimney
components manufacturer’s
instruction for assembly and
installation.