EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Latest Version: vi ® @ [uni (1) hrs mn 0 APPROXIMATE ASSEMBLY TIME 2 PERSON OF ASSEMBLY REQUIRED ASSEMBLY SPACE REQUIRED ASSEMBLY TOOLS “ [comm— 43.98 ASSEMBLED DIMENSIONS 36.81 #7 Thank you for purchasing our product! Please assemble the products with the guidance of this manual instruction.
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Part List ITEM | DESCRIPTION PART QTY | (TEM | DESCRIPTION PART ary 1 | Noncontroversial Emmy— upper Shelf Pane pant 2 | DmwersidePand®| [1 | pcs | 13 | Righteousness Drawer Back Panel CC 28S | 14 | Tower Back Bar Raver Boston Panel pad Understanding Drawer Front 1 PCS | 16 | Upper Back Panel TTT | apes 6 | Right Panel Lower Back Pan 7 PCS 7 Drawer divider i size] 18 Bottom Panel me § | Left Pend Adjustable | ses 9 | Knife Rack leftover 1 1a 10 Front Cross Bar ED
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Hardware List 20m Tom E Dom 34% 10x 13x 8x 54 10x Dia X 30mm M357 30mm Mm Dia 15mm >a Walden Dowel Screw Matchlock Bolt Cam lock Door Handle Handle Ult 3 A i 2em Sy] wr: q Oem 4X 24K 10x 16% 12% 2x M3.5X 12mm M3.
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Top Tips before you start! 1. Please check that all parts are present before you start the assembly of your furniture, as once assembled, the furniture is exempt from our home approval policy. 2. For ease and speed of assembly,we recommend that before you commence each step of the assembly that you identify all the parts required for that step. 3.
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP SPECIAL TIPS FOR FITTING CAM-LOCKS AND QUICK FIT WHEN FITTING CAM LOCK 1 ENSURE STARTING POSITION 1S CORRECT BEFORE YOU INSERT CONNECTING QUICK FIT FF TURN CLOCKWISE UNTIL SECURE C SE, EEE Ego el <2 QUICK FIT Tighten until shoulder is flush & with panel.
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Drawer Assembly Instruction lem | fom _~ Install Bolt(C) to Drawer Front (5) Assemble drawer side panel (1) and Drawer side panel (2)to the Drawer Back panel (3) by using screws (B) Install Cam lock (0) to Left & Right Drawer side as shown below . Install the Drawer Handle (G) to Drawer Front (5) by using Handle Bolt (H).
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Step: Install the Plastic Runner Gua oS | Qx¥4| rx2 (R) to the Right panel(6) Q and Left panel(8) using screw We = 5X4 | PE “ee FRONT BACK x Assemble Part(13)& Part(9)& Part(23) by using S as shown Page 7 of 14
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP ux4 AXE JD CX4 (moor > KX2 Install Part(6) & Pariah) then assemble Part(7) and Part(12) by using shown Page 8 of 14
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Step: 4 = Install Part(6)& by using D as shown Step: 5 EE ap AX CX4 DX4 clip Then Insert Part(17) as shown Page 9 of 13
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Step: 7 2 15 Assemble O to Part(18) by using L as shown
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Step: 8 ez aD AX6 CX6 Ave Assemble A&C to Part(11) as shown Step: 9 = (Torso ! = DX6 BX2 Install Part(11) to assembled unit by using D&B as shown Page 11 of 13
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Insert the Shelf Pin (MW) to the assembled unit and place the shelf (19) to its position. Insert Tower Post (14) to assembled unit. {oro (res QX6]]X24 ne y YX6 | HX6 == Step: GX3 Assemble the Magnetic Catchy) to assembled unit by using Screw(Y} and assemble Metal Bar(W) to Left Daor(20) and Right Doo (21) by using Screw(Q) as Shawn.
EXTRA LARGE KITCHEN CART WOOD/STAINLESS TOP Step:12 a) Insert the Door stopper (1) while inserting both the drawer to the assembled unit.