Instruction manual
Huck-Spin® Series Tooling (HK1076) Alcoa Fastening Systems
25
Hose Guard/Handle (Figures 22 & 23)
23. Using an Allen wrench, remove two
Screws holding Handle to Cylinder, and
two Screws holding both halves together.
(Figure 22)
24. Remove Cable Suspension Assembly
from handle, and separate Handle halves.
25. Unscrew Couplers from Hoses. Drain
fluid, then remove Hoses from Cylinder
and drain cylinder. (Figure 23)
Intermediate Gear & Bearing; Drive
Mounting Flange (Figures 24 & 25)
26. With hex key, unscrew four screws hold-
ing Drive Mounting Flange to Central
Gear Housing, then unscrew four screws
holding Motor boss on Central Gear
Housing. (Figure 24)
27. Lift Motor boss off and remove shaft
locking screw.
28. While pulling Shaft out of Motor boss, lift
out intermediate gear and spacers, and
remove both Ball Bearing Assemblies
from Intermediate Gear. (Figure 25)
Figure 22
Cylinder
Couplers
Handle half
Hoses
Figure 23
Drive
Mounting
Flange
Central Gear
Housing
(Screws at
back side)
Screws
holding Motor
boss to
Central Gear
Housing
Intermediate
Gear
Spacer
Shaft
Figure 24
Ball
Bearing
Assemblies
Intermediate
Gear
Figure 25
D
D
ISASSEMBLY
ISASSEMBLY
(
(
CONTINUED
CONTINUED
)
)