User guide
Configuring Virtual Chassis Managing A Virtual Chassis
OmniSwitch AOS Release 8 Switch Management Guide May 2014 page 13-11
Replacing A Switch
A virtual chassis of four switches is already up and running.
A replacement switch is to be swapped for Chassis 3.
Chassis 3 is shutdown using the VC shutdown feature, pow-
ered off and its VFL connections removed. The existing vir-
tual chassis is then replaced with a new chassis.
2
1
The new switch is connected in place of the old switch
and its VFL connections made. The new switch is pow-
ered on and gets assigned chassis 3, replacing the original
chassis.
3
Chassis-id 1- Master
Chassis-id 2- Slave
Chassis-id 3- Slave
Chassis-id 4 - Slave
Chassis-id 1- Master
Chassis-id 2- Slave
Chassis-id 3- Slave
Chassis-id 4 - Slave
Chassis-id 1- Master
Chassis-id 2- Slave
Chassis-id 3- Slave
Chassis-id 4 - Slave