User guide

Managing CMM Redundancy Managing CMM Directory Content
page 4-18 OmniSwitch AOS Release 7 Switch Management Guide March 2015
Synchronizing the Primary and Secondary CMMs
If you have a secondary CMM in your switch, it will be necessary to synchronize the software between the
primary and secondary CMMs. If the primary CMM goes down then the switch fails over to the second-
ary CMM. If the software in the secondary CMM is not synchronized with the software in the primary
CMM, the switch will not function as configured by the administrator.
At the same time that you copy the RUNNING DIRECTORY to the certified directory, you can synchro-
nize the secondary CMM with the primary CMM. To copy the RUNNING DIRECTORY to the certified
directory of the primary CMM and at the same time synchronize the software of the primary and second-
ary CMM, use the following command:
-> copy running certified flash-synchro
The synchronization process is shown in the diagram below:
In the above diagram:
1 The primary CMM copies its RUNNING-CONFIGURATION to the certified directory.
2 Since the RUNNING-CONIFIGURATION is always synchronzied between redundant CMMs, the
secondary CMM copies its RUNNING-CONIFIGURATION to the certified directory.
To just synchronize the secondary CMM to the primary CMM, enter the following command at the
prompt:
-> copy flash-synchro
The copy flash-synchro command is described in detail in the OmniSwitch AOS Release 7 CLI Reference
Guide.
Running
Certified
Secondary CMM
Running
Certified
Primary CMM
21