Specifications

Starting the OmniAccess 5510 USG
Left running head:
Chapter name (automatic)
6
Beta Beta
OmniAccess 5510 Unified Services Gateway Getting Started Guide
Alcatel-Lucent
STARTING THE OMNIACCESS 5510 USG
After installing OmniAccess 5510 USG and connecting cables, follow the
procedure given below to start the system:
Step 1: Before you power ON the OmniAccess 5510 USG, check the following:
Ensure that the power supply chassis connector is securely inserted into the
chassis and secured.
Ensure that a PC or VT100 terminal is connected to the console port, using the
appropriate console cable. (If the system is not connected to a console, see the
“Connecting to the OmniAccess 5510 USG Console Port” section of this
document to connect the system to a console.)
Step 2: Power ON the OmniAccess 5510 USG.
Power on the OmniAccess 5510 USG by connecting the country specific power
cord to the power source. You should see the system LEDs showing activity. At
this point, the system begins its bootup sequence.
Step 3: Monitor the System front panel LED and console for various bootup
messages.
Once the system begins to startup, monitor the front panel LED for various stages
of booting process (refer to the table given below). In addition to the LED, monitor
the system console for various bootup text messages (an example of a bootup
message is given below). While a console access is not always required for
system startup, it is a good idea to monitor the console at least the first time the
system is booted and initial configurations completed.
LED Information
The following table shows the state in which the main LEDs should be after a
startup.
Table 2: OmniAccess 5510 USG System LED Status
LED Status Description
System Off Power up status. This is the default
display when the system is first
powered on and before the software is
loaded.
Solid Green Power and system OK.
Solid Amber Power and system fail.