Specifications

Installing an OmniAccess 3
4. Install an Uplink Submodule
Skip this step if:
you are not installing an uplink submodule, or
an uplink submodule was installed for you at
the factory.
Caution
Do not attempt to install or remove an
uplink module while the switch’s
power is on. Verify that the switch is
powered off before proceeding.
5. Connect to a Power Source
All OmniAccess switches are powered by an internal
AC
power supply. The
AC
power connector can be
found on the rear panel of all OA-512 switches.
Note
OmniAccess switches do not support
the Alcatel Backup Power System
(BPS).
Connect the provided power cord to the
AC
power
connector on the OmniAccess. Then plug the power
cord into a properly grounded
AC
electrical outlet.
6. Turn the Power On
Move the
ON
/
OFF
power switch (located next to the
AC
power connector) to the
ON
(
|
) position.
a. Use a screwdriver to remove the blank uplink sub-
module cover plate on the OA-512 front panel.
b. Insert the uplink submodule into the uplink submodule
slot. Uplink submodules have an “up” and a “down”
side. Use the printing on the submodule’s front panel as
a reference for orienting the submodule—if the printing
is right-side up, you are installing the submodule cor-
rectly.
c. Slide the uplink submodule in until it rests against the
connector, then press firmly until it seats into the con-
nector. Once installed, tighten the screws by hand or
with a flat blade screwdriver. Ensure that the screws are
completely screwed down, but do not overtighten.