User's Manual

Table Of Contents
3 — Replace a G-240W-A indoor ONT
3-6 Alcatel-Lucent 7368 ISAM ONT
Edition 02
G-240W-A Product Guide
9 If required, have approved service personnel who are trained to work with optic
fiber clean the fiber optic connection. See the 7368 ISAM ONT Configuration,
Management, and Troubleshooting Guide for more information about fiber optic
handling, inspection, and cleaning.
10 Connect the fiber optic cable with SC/APC adapter into the SC/APC connector.
Figure 3-2shows the location of the SC/APC connector.
11 Install the power supply according to manufacturer specifications.
12 Connect the power cable to the power connector.
13 Power up the unit by using the power switch.
14 If used, enable the Wi-Fi service by pressing the WLAN button; see Figure 3-1 for
the location of the WLAN button.
15 If used, configure the SLID; see the 7368 ISAM ONT Configuration, Management,
and Troubleshooting Guide for more information.
16 Verify the ONT LEDs, voltage status, and optical signal levels; see the 7368
Hardware and Cabling Installation Guide.
Danger — Fiber optic cables transmit invisible laser light. To avoid eye
damage or blindness, never look directly into fibers, connectors, or
adapters.
Danger — Fiber cables transmit invisible laser light. To avoid eye
damage or blindness, never look directly into fibers, connectors, or
adapters.
Warning — Be careful to maintain a bend radius of no less than 1.5 in.
(3.8 cm) when connecting the fiber optic cable. Too small of a bend
radius in the cable can result in damage to the optic fiber.
Note — Fiber cable preparation varies depending on the type and size
of the inside or outside plant fiber cable being spliced to the SC/APC
fiber optic pigtail cable.
Note — Observe the following:
Units must be powered by a Listed or CE approved and marked
limited power source power supply with a minimum output rate of
12 V dc, 1.25 A.
Note — A new SLID or the old SLID may be used with the replacement
ONT. If a new SLID is used, the new SLID must also be programmed at
the P-OLT using TL1 or a network manager. If the old SLID is used, no
changes need to be made at the P-OLT; see the operations and
maintenance documentation for the OLT for more details.
R05.02.01 | October 2015 | 3FE-45360-AAAA-TCZZA | Edition 02