7368 ISAM ONT G-120W-F Product Guide Install a G-120W-F indoor ONT
Issue: 01 3FE-46922-AAAA-TCZZA 69
7 Install the power supply according to manufacturer specifications.
8 Connect the power cable to the power connector.
9 Power up the ONT unit by using the power on/off switch.
10 If used, enable the Wi-Fi service by pressing the WLAN button.
11 If used, enable the WPS by pressing the WPS button.
12 Verify the ONT LEDs, voltage status, and optical signal levels; see the 7368 Hardware and
Cabling Installation Guide.
13 Activate and test the services; see the 7368 Hardware and Cabling Installation Guide.
14 If used, configure the SLID; see the 7368 ISAM ONT Configuration, Management, and
Troubleshooting Guide.
15 If necessary, reset the ONT.
i Locate the Reset button on the back of the G-120W-F indoor ONT as shown in
Figure 22.
ii Insert the end of a straightened paper clip or other narrow object into the hole in the
Reset button to reset the ONT.
16 STOP. This procedure is complete.
Note — Fiber cable preparation varies depending on the type and size
of the inside or outside plant fiber cable being spliced to the SC/APC
(SC/UPC) fiber optic pigtail cable.
Note — Observe the following:
Units must be powered by a Listed or CE approved and marked
limited power source power supply with a minimum output rate of
12 V dc, 1.25 A.