A
-240Z-
A
CPE
RTRV-CPE::CPE-1-1-1-1-1;
ii
If the CPE is in service, place the CPE in OOS state.
Example:
ED-CPE::CPE-1-1-1-1-1;
2
Power down the unit by using the on/off power switch. See Figure 14 for the connections on
the A-240Z-A CPE.
Figure 14 A-240Z-A CPE connections
ON/OFF TEL1 TEL2 WAN LAN1 LAN2 LAN3 LAN4 USB USB UPS LED
POWER
ON/OFF
button
TEL1 and TEL2
POTS ports
(RJ-11)
WAN port
(RJ-45)
LAN ports (4)
(RJ-45)
USB 2.0
ports (2)
Power supply
connector
LED on/off
button
Power
connector
Reset
button
26018
3
Disconnect the POTS, WAN, Ethernet, and power cables from the CPE; see Figure 14 for
the connector locations on the A-240Z-A CPE.
4
If applicable, disconnect the UPS.
5
Replace the CPE with the new unit. The CPE can be placed on any flat surface, such as a
desk or shelf.
6
Connect the Ethernet cables directly to the RJ-45 ports; see Figure 14 for the location of the
RJ-45 ports.
7
Connect the WAN cable directly to the RJ-45 port; see Figure 14 for the location of the RJ-45
WAN port.
8
Connect the POTS cables directly to the RJ-11 ports as per local practices; see Figure 14 for
the location of the RJ-11 ports.