Owner`s manual
2
DOOR INSTALLATION
Lock-Out Tag-out all electrical power supplied to the
door before making any electrical installations or
connections. Also Lock-out Tag-out any equipment
near the installation site if that equipment may be
inadvertently operated into the area used to assem-
ble and install the door. Failure to properly de-
energize electrical circuits and disable equipment
during installation and/or maintenance could result in
death or serious injury.
Improper installation of anchoring devices or installa-
tion into aged or unsound concrete block, or other
wall material may result in premature wear, product
failure, property damage, or serious personal injury.
Use proper lifting equipment and techniques.
Properly secure all loads. Failure to properly secure
all lifting loads could result in death or serious injury.
Secure the work area so that persons not
working directly on the installation do not
enter the work area.
TOOLS AND MATERIALS REQUIRED
Personnel
Two people to install the door
One person qualified to operate forklift, hoist,
or crane
One electrician to install and connect the
control panel and all electrical wiring
Tools
Assorted wrenches
Tape measure
Carpenter’s square
Level (4ft minimum recommended)
Lifting device (fork lift, hoist, crane)
Lifting Straps
2 ladders or personnel lifts (tall enough to
reach above the door head)
Other tools as needed for the type of anchor-
ing chosen
Materials
Anchors appropriate for the type of wall the
door and accessories are to be installed on-
to. Albany Doors recommends through-
bolting doors whenever possible.
Wire as specified on the electrical schematic
Electrical supplies needed to comply with all
regulating body electrical codes and stand-
ards.
See applicable control manual with door.
SITE PREPARATION
Electrical Supply
Qualified electrician must make all electrical
mountings and connections in accordance with
all applicable regulating body(s) electrical codes
and standards. . See applicable electrical manual
for specifications and wiring instructions..
Door Opening
1. Are the door jambs and support wall structur-
ally sound providing a flat surface for the side
columns to mount against?
2. Check the width and height of the door open-
ing and verify the measurements against the
dimensions of the door.
3. Is the opening square? Plumb?
4. Is the floor level across the opening?
Make all necessary structural repairs and improvements
to provide a “yes” answer to each of the questions above.
UNPACKING AND PREPARING
1. Inspect and unpack the components. Report any
damage immediately to Albany at 877-925-2468.
Refer to the serial number tag located on the right
door column.
2. DO NOT cut the banding which holds the door in a
roll until instructed to do so in a later procedure.
The door panel and roll assembly could be damaged.
Use evenly spaced padded supports to prevent rips,
tears, or bending of the roll assembly. Failure to pro-
tect the roll assembly could result in damage to the
door.










