Owner`s manual
350016-0000 26 Version 4/22/2010
RAPID ROLL
®
MODEL 355
INSTALLATION CHECKLIST
Door Serial No. __________
Date of Installation __________
Installer’s Name _________________________ Enduser__________________________
Company _______________________________ ________________________________
City ___________________ State ________ City _________ State ____ Zip_______
Phone No. ______________
MECHANICAL:
Crate fully unpacked. Verified door parts against packing list. No parts are missing and
they are undamaged.
Drive unit assembled to top roll assembly.
Door top roll assembly attached to side frames.
Side frames are plumb and door top roll assembly is level.
Door secured to wall along side frames.
Counter balance spring properly tensioned.
Door does not bind in any position and has free movement over the entire range of
motion.
Photocells mounted on inside back profiles. (Factory Wired)
ELECTRICAL:
Fused disconnect installed and properly wired to control panel.
Three phase power available at control panel.
Control panel mounted at a serviceable height.
Drive unit, door limit switches, gearbox disconnect switch, and brake motor kill switch
properly wired to control panel.
Door actuators installed and properly wired to control panel (i.e. pushbuttons, pull
switches, floor loops, etc.).
Proper phase rotation verified.
Door limits properly set.
Gearbox breather plug installed.
All actuators tested and function properly.
Door has been cycled at least 10 times to verify proper operation.
Notes:___________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
FAX COMPLETED FORM TO ALBANY INTERNATIONAL SERVICE DEPARTMENT AT (770) 338-5034.










