ALAXALA AX6300S Hardware Instruction Manual AX63S-H001-50X Reading and storing this manual: z Before you use the equipment, carefully read the manual and make sure that you understand all safety precautions. z After reading the manual, store it in a convenient place for easy reference.
Relevant products This manual applies to the AX6304S and AX6308S models. Export Restrictions If you export this product, please check all restrictions, such as Japan's Foreign Exchange and Foreign Trade Law and USA export control laws and regulations, and carry out all required procedures. If you require more information, please contact an ALAXALA Networks Corporation sales representative. Trademarks - Ethernet is a product name of Xerox Corporation.
Preface About this manual This manual provides hardware instructions for the ALAXALA AX6300S series of multilayer Switches. Before you operate the Switch, read this manual carefully and make sure that you understand all instructions and safety precautions. After reading the manual, store it in a convenient place for easy reference. Intended readers This document is intended for the technical personnel responsible for setting up and handling AX6300S series switches.
Preface Reading sequence of AX6300S series manuals NOTE II The Troubleshooting Guide is common to the AX2400S, AX3600S, AX6300S, AX6600S, and AX6700S series.
Preface Conventions: The terms "Switch" and "switch" The term Switch (upper-case "S") is an abbreviation for any or all of the following models: z AX6300S series switch The term switch (lower-case "s") might refer to a Switch, another type of switch from the current vendor, or a switch from another vendor. The context decides the meaning. How to obtain this manual The AX6300S series manuals are available on the ALAXALA website at the following address: http://www.alaxala.com/en/index.
Contents 1. Components Overview ........................................................................................................... 1 1.1 Switch............................................................................................................................ 2 1.1.1 AX6304S .......................................................................................................... 2 1.1.2 AX6308S ................................................................................................
Contents 3.3 Terminals and connection cables................................................................................ 84 3.3.1 When connecting an operation terminal to the CONSOLE port .................... 84 3.3.2 When connecting an operation terminal to the MANAGEMENT port............ 84 3.3.3 Connecting a modem to the AUX port ........................................................... 86 4. Installing a Switch.......................................................................................
Safety Information Using the AX6300S series switches correctly and safely z This guide provides important information for ensuring safe use of the AX6300S series switches. Please read this guide completely before using your Switch. z Keep this guide handy after reading it, so that it is available for later reference. z Operate the Switch according to the instructions and procedures provided in this manual. z Heed all warnings and cautions for the Switch in this guide.
Safety Information If anything seems wrong, immediately turn off the power. If smoke or an unusual smell is emanating from the Switch, or if liquid is spilled into the Switch or a foreign object falls into the Switch, immediately turn off power to the Switch as described below. Continuing operation could result in fire or electric shock. z For a Switch with an AC power supply unit installed, turn off the Switch power before unplugging the power cable from the outlet.
Safety Information Ensure that the capacity for incoming current to the distribution board is greater than the operating current of the circuit breaker. Ensure that the capacity for incoming current to the distribution board is greater than the operating current of the circuit breaker. If it is not, the circuit breaker might not operate properly in the event of a failure, which could result in fire. Ground the Switch. Each Switch has at most 3.5 mA of leakage current.
Safety Information Place an insulation cover over the 0 V and −48 V terminals of a DC power cable. Place an insulation cover over the 0 V and −48 V terminals of a DC power cable before using them. Using the terminals without an insulation cover could result in fire or electric shock. Do not use a DC power supply with the cover of the terminal board removed. After attaching a power cable, attach the cover to the terminal board when using a DC power supply.
Safety Information Handle power cables carefully. Do not place anything heavy on a power cable. Do not pull, bend, or modify a cable. Doing so could damage the cable, resulting in fire or electric shock. If the power cable is covered with a carpet or the like, it is easy to forget that the cable is there and to place something heavy on it. Use the supplied or a designated power cable. Using another cable could result in fire or electric shock.
Safety Information When pressing the reset button, do not use anything with a fragile tip, or anything that might become caught in the Switch, such as a pin or paper clip. When pressing the reset button on the front panel, do not use anything with a fragile tip, or anything that might become caught in the Switch, such as a pin or paper clip. Doing so could result in fire or electric shock. When adding or replacing a power supply unit, disconnect the power supply cable.
Safety Information Do not install the Switch in a dusty or humid location. Do not install the Switch in a dusty or humid location. Doing so could result in fire or electric shock. Condensation might form on the surfaces and the inside of the Switch if it is moved from a cold location to a warm location. Using the Switch in this condition could result in fire or electric shock.
Safety Information Do not obstruct the ventilation slots. Do not obstruct the ventilation slots of the Switch. Doing so causes heat to accumulate inside the Switch, and could result in fire. Maintain a space of at least 70 mm around the ventilation slots.
Safety Information Do not allow hair or objects near the ventilation slots. Because a Switch is equipped with internal cooling fan units, do not allow anything near ventilation slots. Doing so causes heat to accumulate inside the Switch and could cause a failure. Do not allow hair or other light material or objects near the ventilation slots because they might be sucked into the Switch, resulting in injury. When moving a Switch, do not hold the handles of optional modules.
Safety Information When removing a fan unit, do not place your hands near the fan if it is rotating. Immediately after a fan unit is removed, the blades might still be rotating. While the fan blades are rotating, do no place your hands near them. Doing so might result in injury. The following label is attached to a fan unit. Handle the power cable carefully. Do not place a power cable near a heat-generating apparatus, because the heat could melt the cable coating, resulting in fire or electric shock.
Safety Information Cleaning Remove dust on and around the Switch regularly. In addition to causing the switch to stop, accumulated dust could result in fire or electric shock.
Safety Information Do not turn off the Switch power while software is being updated (when the ppupdate command is being executed). When the ppupdate command is executed, the Switch restarts automatically. Do not turn off the Switch until it is restarted (until the STATUS LED on the management and switching unit changes from blinking green to constant green). Failure to do so could result in a Switch failure. If the ACC LED is lit, do not remove the memory card or turn off the power.
Safety Information When replacing a fan unit with the Switch turned on, observe the time limit. When replacing a fan unit with the Switch on, you must remove and replace the unit within one minute. If the operation takes longer than one minute, the temperature inside the Switch will rise and possibly cause a failure. When carrying or packing a Switch and an optional module, wear a wrist strap to protect against static electricity. Be sure to wear an antistatic wrist strap.
Safety Information Install an optional module carefully. Follow the procedure below when you install an optional module. Failure to do so could result in a failure or a malfunction of the Switch. 1. Open the levers as shown in the figure. 2. While holding the levers, push the optional module carefully until the levers touch the Switch. 3. Use the levers to push the optional module as far as it will go. When moving a lever, move it slowly (for one second or longer) without exerting strain.
Safety Information Do not use a TV or a radio near a Switch. Placing a Switch near a TV or a radio could affect both devices. If you hear noise on the TV or radio, do the following: z Place the Switch as far away as possible from the TV or radio. z Adjust the orientation of the TV or radio antenna. z Use separate outlets. Do not place a Switch where it will be exposed to hydrogen sulfide or salt.
Safety Information Disposing of a Switch When disposing of a Switch, you should either follow local ordinances or regulations or contact your local waste disposal and treatment facility.
1. Components Overview This chapter provides an overview of the various parts of the Switch. 1.1 Switch 1.2 Fan unit (FAN) 1.3 Power supply unit (PS) 1.4 Management and switching unit (MSU) 1.5 Network interface unit (NIF) 1.6 Memory card (MC) 1.7 Transceiver 1.8 Blank panel 1.9 Power cable 1.10 Rack fixture 1.
1. Components Overview 1.1 Switch The AX6300S series switches are Layer 3 switches suitable for the backbone of a large-scale independent network, the core of a medium-scale network, or the edge of a service provider's Layer 3 network. The following are the features of AX6300S series switches: z High-density 10-Gigabit Ethernet z Excellent performance, reliability, availability, and security z Environment-friendly low power consumption The following table lists the models of the AX6300S series.
1. Components Overview (1) External appearance Figure 1-1 Front view (1) Management and switching unit (MSU) slot (2) Network interface unit (NIF) slot (3) Rack fixture (4) Handles (5) Wrist strap terminal NOTE A rack fixture attached to a Switch is used to secure the rack pillars and the front of the Switch so that they are flat when the Switch is installed in a rack.
1. Components Overview (1) Power supply unit (PS) slot (2) Fan unit (FAN) slot (3) Handles Figure 1-3 Rear view (with a DC power supply unit installed) (1) Power supply unit (PS) slot (2) Fan unit (FAN) slot (3) Handles (2) Slot number The following figures show the slot numbers of optional modules for the Switch.
1. Components Overview Figure 1-6 Rear of the Switch (with a DC power supply unit installed) NOTE A network interface unit comes in a single-size model and a double-size model. The NIF number when a double-size network interface unit is installed is the number indicated by *1. (3) Number of installed power supply units and installation location NOTE Power supply units come in an AC model and a DC model. Do not install both an AC power supply unit and DC power supply unit on a single Switch.
1. Components Overview Table 1-3 Installation locations of DC power supply units Power supply redundancy method Power supply redundancy 1+1 redundancy NOTE Basic Redundancy PS1 PS2 None Y N Required Y Y If you install a power supply unit in a location other than those above, it will not operate properly. (4) LEDs and switches LEDs and switches are located on each optional module. For information about the LEDs and switches on the front of the Switch, see 1.
1. Components Overview (2) Network interface unit (NIF) slot (3) Rack fixture (4) Handles (5) Wrist strap terminal NOTE A rack fixture attached to a Switch is used to secure the rack pillars and the front of the Switch so that they are flat when the Switch is installed in a rack. If a 100 mm space cannot be maintained between the rack door and the front of the Switch, you can use another fixture (sold separately) that fixes the front of a Switch so that it is recessed 50 mm from a rack pillar.
1. Components Overview Figure 1-9 Rear view (with a DC power supply unit installed) (1) Power supply unit (PS) slot (2) Fan unit (FAN) slot (3) Handles (2) Slot number The following figures show the slot numbers of optional modules for the Switch. Figure 1-10 Front of the Switch NOTE 8 A network interface unit comes in a single-size model and a double-size model. The NIF number when a double-size network interface unit is installed is the number indicated by *1.
1. Components Overview Figure 1-11 Rear of the Switch (with an AC power supply unit installed) NOTE A power supply unit can be installed in the PS1 to PS4 slots. The PS5 and PS6 slots cannot be used. Figure 1-12 Rear of the Switch (with a DC power supply unit installed) NOTE A power supply unit can be installed in the PS1 and PS2 slots. The PS3 slot is not used. (3) Number of installed power supply units and installation location NOTE Power supply units come in an AC model and a DC model.
1. Components Overview Table 1-4 Installation locations of AC power supply units Power supply redundancy method Power supply redundanc y 2+2 redundancy Basic Redundancy For expansion PS1 PS2 PS3 PS4 PS5 PS6 None Y Y N N N N Required Y Y Y Y N N If you install a power supply unit in a location other than those above, it will not operate properly.
1. Components Overview (1) Before using an AX6300S series switch This document lists the items supplied with a Switch when it is shipped from the factory. (2) Using the Switch Safely This document includes important notes regarding safe use of the Switch. Be sure to read this document before use.
1. Components Overview 1.2 Fan unit (FAN) 1.2.1 FAN-11 The FAN-11 fan unit is common to AX6300S series switches, and is included in each Switch. (1) External appearance Figure 1-13 External appearance (1) Handles (2) Installation screw (3) LEDs (2) LED Table 1-7 LED indications Type Status Description LED: Green, orange, or red Indicates the operating status of the fan unit. Green: Normal operation Orange: A lamp test is in progress. Red: A failure has been detected.
1. Components Overview 1.3 Power supply unit (PS) NOTE Power supply units come in an AC model and a DC model. Do not install both an AC power supply unit and DC power supply unit on a single Switch. If you install both units, they will not operate properly. 1.3.1 PS-A11 The PS-D11 power supply unit is common to AX6300S series switches. This power supply unit supports 100 V AC and 200 V AC.
1. Components Overview (2) LED A power supply unit indicates its status with a combination of two LEDs, as described in the following table. Table 1-8 LED indications Name Description POWER (LED: Green) ALARM (LED: Red) ON OFF The power supply output voltage is normal. OFF ON A power supply output voltage error has occurred. OFF OFF The power is off or a power supply output voltage error has occurred.#1 #1: Depending on the kind of error, both the POWER LED and the ALARM LED might be off.
1. Components Overview (1) External appearance Figure 1-16 External appearance (1) ALARM LED (2) POWER LED (3) Terminal for measuring voltage (4) Cable clamp (5) Terminal board cover (6) Handles (7) Installation screw (8) Circuit breaker (9) Terminal board A power supply unit has a terminal for measuring voltage. This terminal is used for inspection before the unit is shipped from the factory. Customers must not use this terminal.
1. Components Overview Table 1-9 LED indications Name Description POWER (LED: Green) ALARM (LED: Red) ON OFF The power supply output voltage is normal. OFF ON A power supply output voltage error has occurred. OFF OFF The power is off or a power supply output voltage error has occurred.#1 #1: Depending on the kind of error, both the POWER LED and the ALARM LED might be off. (3) Accessories No accessories are available. The customer must provide a power cable.
1. Components Overview 1.4 Management and switching unit (MSU) The following figures show the external appearance of the management and switching units. Figure 1-17 External appearance of the MSU-1A and the MSU-1B (1) Memory (2) Installation screw (3) Lever Figure 1-18 External appearance of the MSU-1A1 and the MSU-1B1 (1) Memory (2) Installation screw (3) Lever NOTE The management and switching unit comes in two sizes: a standard table size and an extended table size.
1. Components Overview NOTE In a management and switching unit, a flash disk is used as a storage device for storing base software, configuration information, and log information. The number of times the flash disk can be written to is limited and should be noted during operation. For detailed notes about writing data to a flash disk, see 11 Switch Management in the Software Manual Configuration Guide Vol. 1. 1.4.
1. Components Overview that can be displayed on the LCD. Figure 1-20 External appearance of the system operation panel (1) LCD (2) Back button (3) Enter button (4) Forward button NOTE If you press the back and forward buttons at the same time, you can perform a lamp test. For details about operations in addition to the lamp test and the information that can be displayed on the LCD, see 11 Switch Management in the Software Manual Configuration Guide Vol. 1.
1. Components Overview Name Type Status Description ACC LED: Green Indicates the memory card status. Green: The memory card is being accessed. (Do not remove the memory card.) Off: The memory card is in idle mode. (A memory card can be plugged in or removed.) RESET Switch (non-locking) Used to reset the Switch manually.#2 Press one second: Use this method when a Switch failure has occurred.#3 Press five seconds: Use this method when you have forgotten the password.
1. Components Overview When pressing a switch, do not use anything with a fragile tip, or anything that might become caught in the Switch, such as a pin or paper clip. Doing so could result in fire or electric shock. 1.4.2 MSU-1B and MSU-1B1 This is a management and switching unit (extended table size type) which is used in common among the AX6300S series switches.
1. Components Overview Figure 1-22 External appearance of the system operation panel (1) LCD (2) Back button (3) Enter button (4) Forward button NOTE If you press the back and forward buttons at the same time, you can perform a lamp test. For details about operations in addition to the lamp test and the information that can be displayed on the LCD, see 11 Switch Management in the Software Manual Configuration Guide Vol. 1.
1. Components Overview Name Type Status Description ACC LED: Green Indicates the memory card status. Green: The memory card is being accessed. (Do not remove the memory card.) Off: The memory card is in idle mode. (A memory card can be plugged in or removed.) RESET Switch (non-locking) Used to reset the Switch #2 manually. Press one second: Use this method when a Switch failure has occurred.#3 Press five seconds: Use this method when you have forgotten the password.
1.
1. Components Overview 1.5 Network interface unit (NIF) The following table lists network interface units supported by the Switch. Table 1-12 Network interface units Size Name Interface 10/100/1000BASE-T Single-size Double-size 1000BASE-X 10GBASE-R NH1G-24T 24 ports -- -- NH1G-16S -- 16 ports -- NH1G-24S -- 24 ports -- NH1GS-6M 4 ports 2 ports -- NH10G-1RX -- -- 1 port NH10G-4RX -- -- 4 ports NH10G-8RX -- -- 8 ports 48 ports -- -- NH1G-48T 1.5.
1. Components Overview Front view The front view is shown below. For information about LEDs, see Table 1-13 LED indications. Figure 1-24 Front view (1) STATUS LED (2) LINK/TR LED (3) Ethernet port (10/100/1000BASE-T) LED Table 1-13 LED indications Name Type Status Description STATUS LED: Green, orange, or red Indicates the operating status of the network interface unit. Green: Operation is possible. Orange: A reset is in progress. Blinking green: Startup is in progress.
1. Components Overview #6: Always turns off if the interface port LED is set to off. When an operation key on the system operation panel is used, the LED lights up, and the operating status can be checked. If no keys are used for 60 seconds, the LED turns off again. If no system recovery is set and a failure occurs in a Switch, the Switch can stay stopped without recovering the failed part. This function is supported by software version 10.3 and later.
1. Components Overview Name Type Status Description LINK/TR LED: Green or Orange Indicates the operating status of the Ethernet port.#6 Indicates the operating status of the #6 Ethernet port. Green: A link is established. Blinking green: A frame is being sent or received. Orange: A failure has been detected. Off: A link failure occurred#3 #4 or operation has stopped.
1. Components Overview Figure 1-26 Front view (1) STATUS LED (2) LINK/TR LED (3) Ethernet port (1000BASE-X) LED Table 1-15 LED indications Name Type Status Description STATUS LED: Green, orange, or red Indicates the operating status of the network interface unit. Green: Operation is possible. Orange: A reset is in progress. Blinking green: Startup is in progress. Red: A failure has been detected. Off: Power is off. (The network interface unit can be replaced.
1. Components Overview NOTE If no system recovery is set and a failure occurs in a Switch, the Switch can stay stopped without recovering the failed part. This function is supported by software version 10.3 and later. (4) NH1GS-6M The NH1GS-6M is a network interface unit with the following hardware specifications: z Ethernet port (10/100/1000BASE-T): 4 ports z Ethernet port (1000BASE-X): 2 ports NOTE For information about the SFP transceivers supported by the Switch, see 1.7.1 SFP.
1. Components Overview LED Table 1-16 LED indications Name Type Status Description STATUS LED: Green, orange, or red Indicates the operating status of the network interface unit. Green: Operation is possible. Orange: A reset is in progress. Blinking green: Startup is in progress. Red: A failure has been detected. Off: Power is off. (The network interface unit can be replaced.)#1 #2 LINK/TR LED: Green or Orange Indicates the operating status of the Ethernet port.#6 Green: A link is established.
1. Components Overview Front view The front view is shown below. For information about LEDs, see Table 1-17 LED indications. Figure 1-28 Front view (1) STATUS LED (2) LINK LED (3) T/R LED (4) Ethernet port (10GBASE-R) LED Table 1-17 LED indications Name Type Status Description STATUS LED: Green, orange, or red Indicates the operating status of the network interface unit. Green: Operation is possible. Orange: A reset is in progress. Blinking green: Startup is in progress.
1. Components Overview the system operation panel is used, the LED lights up, and the operating status can be checked. If no keys are used for 60 seconds, the LED turns off again. If no system recovery is set and a failure occurs in a Switch, the Switch can stay stopped without recovering the failed part. This function is supported by software version 10.3 and later.
1. Components Overview Name T/R Type Status LED: Green Description Blinking green: A frame is being sent or received. Off: No frames are being sent or received. #1: A network interface unit can be turned off by the Inactivate operation from the system operation panel or by entering a command from the operation terminal.
1. Components Overview (1) STATUS LED (2) LINK LED (3) T/R LED (4) Ethernet port (10GBASE-R) LED Table 1-19 LED indications Name Type Status Description STATUS LED: Green, orange, or red Indicates the operating status of the network interface unit. Green: Operation is possible. Orange: A reset is in progress. Blinking green: Startup is in progress. Red: A failure has been detected. Off: Power is off. (The network interface unit can be replaced.
1. Components Overview 1.5.2 Double-size The external appearance of a double-size network interface unit is shown below. Figure 1-31 External appearance (1) Installation screw (2) Lever (3) Interface port (1) NH1G-48T The NH1G-48T is a network interface unit with the following hardware specification: z Ethernet port (10/100/1000BASE-T): 48 ports Front view The front view is shown below. For information about LEDs, see Table 1-20 LED indications.
1. Components Overview LED Table 1-20 LED indications Name Type Status Description STATUS LED: Green, orange, or red Indicates the operating status of the network interface unit. Green: Operation is possible. Orange: A reset is in progress. Blinking green: Startup is in progress. Red: A failure has been detected. Off: Power is off. (The network interface unit can be replaced.)#1 #2 LINK/TR LED: Green or orange Indicates the operating status of the Ethernet port.#6 Green: A link is established.
1. Components Overview 1.6 Memory card (MC) To use a memory card, install it in a management and switching unit. The memory card is used for the following: z Backing up operating information z Saving troubleshooting information in the event of a failure z Updating the Switch software (1) SD128 This memory card is an SD memory card with a capacity of 128 MB.
1. Components Overview 1.7 Transceiver 1.7.1 SFP To use an SFP transceiver, connect it to an Ethernet port on the network interface unit. The SFP transceivers supported by the Switch are listed in Table 1-21 List of SFP transceivers.
1.
1.
1. Components Overview (7) SFP-BX1D Figure 1-40 External appearance (1) Label at the back of the transceiver: ALAXALA SFP-BX1D Label color: White (2) Lever color: Magenta (8) SFP-BX4U Figure 1-41 External appearance (1) Label at the back of the transceiver: ALAXALA SFP-BX4U Label color: White (2) Lever color: Yellow (9) SFP-BX4D Figure 1-42 External appearance (1) Label at the back of the transceiver: ALAXALA SFP-BX4D Label color: White (2) Lever color: Green 1.7.
1. Components Overview unit. The XFP transceivers supported by the Switch are listed in Table 1-22 List of XFP transceivers. Table 1-22 List of XFP transceivers Num ber Module name Interface 1 XFP-SR 10 Gigabit Ethernet 10GBASE-SR 2 XFP-LR 10 Gigabit Ethernet 10GBASE-LR 3 XFP-ER 10 Gigabit Ethernet 10GBASE-ER 4 XFP-ZR 10 Gigabit Ethernet 10GBASE-ZR The Switch uses laser beams that are colorless and transparent, and invisible to the eye. Never look directly into the optical transceiver.
1.
1. Components Overview 1.8 Blank panel When a slot does not contain an optional module, a blank panel is inserted in the slot. The blank panel serves the following purposes: z Ensures the flow of air inside the Switch. z Reduces radio interference from the Switch. z Protects the Switch from radio interference by another device. CAUTION Insert a blank panel in a slot in which there is no optional module.
1. Components Overview (3) BPNL-NF11 The blank panel for a network interface unit.
1. Components Overview 1.9 Power cable 1.9.1 CBL-A12 A 2.5 m 200 V AC power cable (sold separately). Use this cable when you use a Switch in a 200 V AC environment. (1) External appearance Figure 1-50 CBL-A12 When using a Switch in a 200 V AC environment, use only the separately sold ALAXALA power cable, or a power cable that meets ALAXALA specifications. Using another cable could result in fire or electric shock. In addition, do not use the supplied power cable with another switch.
1. Components Overview 1.10 Rack fixture A bracket (sold separately) used to attach the Switch to a 19-inch cabinet rack. With this bracket, you can fix a Switch so that it is recessed 50 mm from the rack pillar. 1.10.1 BRK-11 The BRK-11 is a rack fixture for the AX6304S. (1) External appearance Figure 1-52 BRK-11 (1) Left: L (2) Right: R (2) Accessories Installation screws for the BRK-11. Figure 1-53 Screws (M4 x 8, 6 screws) 1.10.2 BRK-12 The BRK-12 is a rack fixture for the AX6308S.
1. Components Overview (1) External appearance Figure 1-54 BRK-12 (1) Left: L (2) Right: R (2) Accessories Installation screws for the BRK-12.
1. Components Overview 1.11 Support bracket 1.11.1 BRK-14 The BRK-14 support brackets are a pair of brackets used for installation of the AX6304S in a rack. When the support brackets are used together with the rack fixture, the Switch can be installed in the rack without using a guide rail. The support brackets can be used for a 19-inch cabinet rack that conforms to the EIA standard. The support bracket supports the AX6304S only. Do not use the bracket with another Switch.
2. Preparation for Installation This chapter describes the environment conditions and preparations required for installation of the Switch. Before preparing for the installation, read this chapter carefully and be sure that you understand all instructions and notes within. 2.1 Preparation workflow 2.2 Installation conditions 2.3 Carrying a Switch 2.4 Power supply facility 2.5 Notes on electric noise 2.6 Leakage current 2.7 Environment conditions 2.8 Installation location 2.9 Maintenance area 2.
2. Preparation for Installation 2.1 Preparation workflow The workflow to prepare for installation is shown in Figure 2-1 Flowchart of preparation for installation. Be sure to schedule enough time to complete the following work before installing the Switch: power supply work, communications equipment work, and laying down LAN cables.
2. Preparation for Installation 2.2 Installation conditions The general installation requirements for the Switch are described below. The installation environment must meet these requirements.
2. Preparation for Installation #4: The value is measured at 1 m from the side of the Switch. The number of rotations of the fan varies according to the intake temperature. Because of this, the value of the noise changes. #5: According to JIS Z 8813 Measuring Methods for Suspended Particulate Matter Concentration in Air.
2. Preparation for Installation 2.3 Carrying a Switch (1) Number of people The weight of the Switch is shown in the table below. The Switch must be installed and carried by at least three people. Table 2-2 Number of people required to carry a Switch: Model Weight AX6304S 45 kg AX6308S 64 kg Number of people Three or more The Switch must be carried by at least three people.
2. Preparation for Installation Figure 2-4 Location of handles for the AX6308S (front) (1) Handles Figure 2-5 Location of handles for the AX6308S (rear) (1) Handles When moving a Switch, do not hold the handle of the fan unit or power supply unit. The handle might come off, resulting in the Switch falling and possibly causing injury. Also, the fan unit or power supply unit might become deformed, resulting in fire or electric shock.
2. Preparation for Installation 2.4 Power supply facility 2.4.1 Power supply facility for 100 V AC (1) Outlet Use an outlet shown below, that conforms to the JIS and NEMA standards. This type of electrical outlet is available from electrical equipment suppliers. Table 2-3 Electrical outlet standards Standards Specifications JIS C-8303 NEMA 5-15R 15A 125V, two-pin grounded outlet Figure 2-6 Two-pin grounded outlet (125V 15A) Always use a grounded power outlet.
2. Preparation for Installation Ensure that the capacity for incoming current to the distribution board is greater than the operating current of the circuit breaker. If it is not, the circuit breaker might not operate properly in the event of a failure, which could result in fire. NOTE Generally, the breaker operating current is greater than the rated current. Check the specifications of the circuit breaker. In addition, when a Switch is turned on, inrush current shown in the figure below flows.
2. Preparation for Installation (2) Outlet Use an outlet shown below, that conforms to the JIS and NEMA standards. This type of electrical outlet is available from electrical equipment suppliers. Table 2-7 Electrical outlet standards Standards Specifications JIS C-8303 NEMA L6-20R 20 A 250 V, Two-pin grounded twist-lock outlet Figure 2-7 Two-pin grounded twist-lock outlet (250 V, 20 A) Always use a grounded power outlet.
2. Preparation for Installation (4) Requirements for the incoming current to the distribution board The capacity of the incoming current to the distribution board must be greater than that of the breaker operating current described in the above (3) Distribution board. Ensure that the capacity for incoming current to the distribution board is greater than the operating current of the circuit breaker.
2. Preparation for Installation Figure 2-8 0 V and −48 V terminals (1) 17.8 mm (max) (2) 17.5 mm (max) (3) 6.3 to 6.9 mm (4) Insulation cover Place an insulation cover over the 0 V and -48 V terminals. Using the terminals without an insulation cover could result in fire or electric shock. Place the insulation cover so that the distance from the hole of the terminal to the insulation cover is 17.5 mm or less (half of the width of the terminal board for the power supply unit).
2. Preparation for Installation Figure 2-10 Terminal board of the DC power supply unit (1) Cable clamp (2) 0V terminal (screw: M6) (3) −48V terminal (screw: M6) (4) Ground terminal (screw: M6) (2) Distribution board Use circuit breakers on the branch circuit supplying power to the Switch. See the following table for the rated breaker capacity and the required quantity.
2. Preparation for Installation NOTE Generally, the breaker operating current is greater than the rated current. Check the specifications of the circuit breaker. In addition, if a Switch is turned on, the inrush current described in Table 2-12 Inrush current flows. Consider measures for avoiding a voltage drop in the power supply facility caused by the inrush current. Be especially careful, when using a UPS or CVCF.
2. Preparation for Installation 2.5 Notes on electric noise Electric noise emitted by other devices can cause failures. Note the following points when designing a plan for the power supply facility: 64 z The branch circuit of the power supply to the Switch should not be connected to devices that use a relay, micro-switches, or other means to power them on and off repeatedly, such as air conditioners.
2. Preparation for Installation 2.6 Leakage current The Switch is equipped with a noise filter to prevent failure due to electric noise. As a result, a maximum leakage current of 3.5 mA flows through the protective ground line (Type D grounding). Be sure to consider whether the installation of a residual current circuit breaker is required for compliance with the Fire Service Act or other legislation.
2. Preparation for Installation 2.7 Environment conditions (1) Dust Because cooling fan units are mounted in a Switch, do not install them in a humid or dusty place. Dust requirements for the Switch are as follows: z Airborne dust concentration: 0.15 mg/m3 or less (according to JIS Z 8813 Measuring Methods for Suspended Particulate Matter Concentration in Air: General Requirements) NOTE Generally, areas around printers or with large numbers of people passing by contain high levels of toner or dust.
2. Preparation for Installation (8) Spraying When spraying pesticide or disinfectant in the room where the Switch is installed, cover the Switch beforehand to prevent direct exposure to chemicals. (9) Earthquake countermeasures Earthquakes can cause Switches to shift, fall over, or fall out of windows, possibly resulting in bodily injury or death. Take sufficient precautions to prevent the Switch from shifting or falling over.
2. Preparation for Installation 2.8 Installation location The Switch can be installed on either a desktop or a 19-inch cabinet rack. (1) On a desktop When installing the Switch on a desktop, use a level, stable, and flat surface. When installing the Switch on a desktop, consider the requirements described in the following table. Table 2-13 Requirements for installing on a desktop Item Conditions Air intake and exhaust space Ensure at least 70 mm of space around all air vents of the Switch.
2. Preparation for Installation can use an optional fixture that secures the Switch so that it is recessed 50 mm from the rack pillar. For information about this separately sold fixture, see 1.10 Rack fixture. Table 2-15 Required brackets Bracket AX6304S AX6308S Specifications Guide rail Y Y Supplied with the rack. The width must be 56 mm or less.#1 #2 Shelf Y Y Supplied with the rack.#1 Support bracket Y -- Sold separately. Only for the AX6304S. Legend Y: Can be used. --: Cannot be used.
2. Preparation for Installation Purpose When a support bracket is used AX6304S AX6308S For securing a Switch 4 8 For securing the support bracket 4 -- For securing a Switch 4 -- Specifications Note 1: For the number of screws used to secure a guide rail or a shelf, see the documentation supplied with your rack.
2. Preparation for Installation 2.9 Maintenance area Ensure a proper amount of space for Switch maintenance as described below.
2. Preparation for Installation 2.10 Cooling requirements 2.10.1 Airflow The following describes the airflow of the Switch. (1) AX6304S Figure 2-14 AX6304S (2) AX6308S Figure 2-15 AX6308S 2.10.2 Cooling requirements for a desktop installation Ensure at least 70 mm of space for airflow on all sides of the Switch. Do not obstruct the ventilation slots of the Switch. Doing so causes heat to accumulate inside the Switch, and could result in fire.
2. Preparation for Installation NOTE When equipment with forced air cooling systems is installed near the Switch, interference due to the airflow from multiple devices can adversely affect the cooling of the Switch, which might result in a malfunction. z The exhaust airflow from nearby equipment might be drawn into the Switch, and the Switch air intake temperature might exceed the environment requirements.
2. Preparation for Installation 2.11 Device noise Switches contain cooling fans that generate noise. Consider this noise when planning the layout for the installation of devices. For details about the noise emitted by the Switch, see 2.2 Installation conditions. NOTE 74 Some examples of a layout that takes noise into account are given below. z Separate the area by using partitions or shelves to block the direct propagation of noise.
3. Preparation of Interface Cables and Terminals This chapter describes the interface cables and the terminals used for the Switch. 3.1 List of interface cables 3.2 Details about interface cables 3.
3. Preparation of Interface Cables and Terminals 3.1 List of interface cables This section describes the interface cables used for the Switch. The customer is responsible for obtaining these cables.
3. Preparation of Interface Cables and Terminals Port Transceiver 10GBASE-R port Interface SFP-BX4D 1000BASE-BX4 0-D XFP-SR 10GBASE-SR Cable Multimode fiber optic cable (core/cladding diameter = 50 μm/125 μm) Connector LC duplex connector Multimode fiber optic cable (core/cladding diameter = 62.
3. Preparation of Interface Cables and Terminals 3.2 Details about interface cables NOTE To allow for Switch maintenance, fiber optic cables should be the necessary length (3 m), and the excess cabling should be bundled near the Switch. When fiber optic cables and other interface cables are used together, be sure to avoid applying excessive stress on the fiber optic cables. NOTE Always have extra fiber optic cables ready in addition to the ones in use. 3.2.
3.
3. Preparation of Interface Cables and Terminals Item Physical specifications Optical reception power (mean) -19.0 to -3.0 dBm Optical transmission loss (max) 10.0 dB Transmission distance 2 m to 1 km#1 2 m to 2 km #1: The transmission distance can be increased by using the mode conditioning patch code. However, the maximum distance for transmission is 2 km, and that distance depends on transmission loss. For 2 km transmission, the transmission loss must be no more than 10 dB.
3. Preparation of Interface Cables and Terminals Table 3-8 Physical specifications for 1000BASE-LHB Item Physical specifications Cable type Core/cladding diameter Single-mode Single-mode (DSF) 10 μm/125 μm 8 μm/125 μm Center emission wavelength 1.480 to 1.580 μm Optical transmission power (mean) +2.0 to +7.0 dBm Optical reception power (mean) -34.0 to -9.0 dBm Optical transmission loss (max) 36.
3. Preparation of Interface Cables and Terminals Table 3-10 Physical specifications for 10GBASE-SR Item Physical specifications Cable type Multi-mode 50 μm/125 μm Core/cladding diameter Transmission band 400 MHz x km 500 MHz x km 62.5 μm/125 μm 2,000 MHz x km 160 MHz x km 200 MHz x km 2 m to 26 m 2 m to 33 m 0.840 to 0.860 μm Center emission wavelength Optical transmission power (mean) -7.3 to -1.0 dBm Optical reception power (mean) -9.9 to -1.
3. Preparation of Interface Cables and Terminals Item Physical specifications Center emission wavelength 1.530 to 1.565 μm Optical transmission power (mean) +0.5 to +4.0 dBm Optical reception power (mean) -24.0 to -7.0 dBm Optical transmission loss (max) 24.5 dB#1 Transmission distance 2 m to 80 km #1: When optical transmission loss is 15 dB or less, use an optical attenuator to adjust the loss.
3. Preparation of Interface Cables and Terminals 3.3 Terminals and connection cables 3.3.1 When connecting an operation terminal to the CONSOLE port (1) Operation terminal To connect an operation terminal to the CONSOLE port of the Switch, prepare a personal computer or a workstation that meets the specifications in the following table.
3. Preparation of Interface Cables and Terminals Table 3-15 Operation terminal (when connecting to the MANAGEMENT port) Item Specifications Communication port 10BASE-T/100BASE-TX port Communication software Tera Term Pro (Version 2.3) or another Telnet client Communication procedure Telnet, FTP FTP client#1 #1: Used for transferring software and dump files.
3. Preparation of Interface Cables and Terminals RJ 45 pin number 8 Physical specifications 10BASE-T #1 Not used (d) 100BASE-TX #1 Not used (d) #1: Connect to the pin if you are using a 4-pair, 8-core cable. #2: Twisted pair line. Use (A) and (a), (B) and (b), (C) and (c), (D) and (d) in pairs for a 4-pair, 8-core cable. Use (A) and (a) and (B) and (b) in pairs for a 2-pair, 4-core cable. 3.3.
4. Installing a Switch This chapter describes the procedure for installing a Switch. 4.1 Required tools 4.2 Read prior to operation 4.3 Installing a Switch on a desktop 4.4 Replacing the rack fixture 4.5 Mounting in a rack 4.6 Connecting and disconnecting the power cable 4.7 Attaching a wrist strap 4.8 Inserting and removing memory cards 4.9 Inserting and removing SFP transceivers 4.10 Inserting and Removing XFP transceivers 4.11 Connecting operation terminals 4.12 Connecting interface cables 4.
4. Installing a Switch 4.1 Required tools The following tools are necessary to install a Switch: No. 2 Phillips screwdriver Required when using M5 screws to replace a rack fixture or mount a Switch on a rack. This screwdriver is also required when connecting or disconnecting a DC power cable. No. 3 Phillips screwdriver Required when using M6 screws to mount a Switch on a rack. This screwdriver is also required when connecting or disconnecting a DC power cable.
4. Installing a Switch 4.2 Read prior to operation When installing the Switch on a table, position the Switch horizontally on a worktable strong enough to bear the weight of the Switch. Placing the Switch in an unstable location, such as on an unsteady or tilting surface, might cause the Switch to fall, resulting in injury. Do not obstruct the ventilation slots of the Switch. Doing so causes heat to accumulate inside the Switch, and could result in fire.
4. Installing a Switch 4.3 Installing a Switch on a desktop A Switch can be placed on a stable, flat surface. Rubber pads are attached to the bottom of the Switch when it is shipped from the factory. When installing a Switch on a desktop, do so without removing the rubber pads. When installing the Switch, hold it by the bottom and the handles.
4. Installing a Switch 4.4 Replacing the rack fixture A rack fixture attached to a Switch is used to secure the rack pillars and the front of the Switch so that they are flat when the Switch is installed in a rack. If you purchased an optional fixture, which secures the Switch so that it is recessed 50 mm, use the following procedure to replace the rack fixture. 4.4.1 AX6304S Step 1 Remove the rack fixture that was attached to the Switch when it was shipped from the factory.
4. Installing a Switch Figure 4-3 Attaching the rack fixture (1) Left: L (2) Right: R (3) Screws NOTE Use the screws supplied with the optional rack fixture to secure it to the Switch. 4.4.2 AX6308S Step 1 Remove the rack fixture that was attached to the Switch when it was shipped from the factory.
4. Installing a Switch Figure 4-4 Removing the rack fixture (1) Left: L (2) Right: R (3) Screws NOTE Make sure you keep the rack fixture and screws you remove. Step 2 Attach the optional rack fixture.
4. Installing a Switch Figure 4-5 Attaching the rack fixture (1) Left: L (2) Right: R (3) Screws NOTE 94 Use the screws supplied with the optional rack fixture to secure it to the Switch.
4. Installing a Switch 4.5 Mounting in a rack The Switch can be mounted in to a 19-inch cabinet rack that conforms to the EIA standard. The procedure for mounting in a rack is described below. It is not possible for the provided rack fixture alone to support the weight of a Switch. Its purpose is merely to hold a Switch on the rack.
4. Installing a Switch Figure 4-7 Installation location of the guide rail (1) Rubber pad (2) Guide rail (3) Rack pillar NOTE Dotted lines (- - -) in the Figure indicate the boundary between units (U). When attaching a guide rail, align the top of the guide rail with the boundary (U). NOTE Rubber pads are attached to the bottom of a Switch when it is shipped from the factory. The height of a rubber pad is 0.7 mm. When using a shelf, adjust it so that it is 0.7 mm below the boundary (U).
4. Installing a Switch (3) Guide rail The maximum weight of the AX6304S is 45 kg. The Switch must be installed and carried by at least three people. Installing or carrying a Switch with too few people could result in the Switch being dropped or falling, possibly leading to injury. When moving a Switch, do not hold the handle of the fan unit or power supply unit. The handle might come off, resulting in the Switch falling and possibly causing injury.
4. Installing a Switch Step 1 Install brackets L and R in the rack. For the installation location of the brackets, see Figure 4-11 Installation location of the support brackets. Figure 4-10 Installing support brackets (1) Bracket L (2) Bracket R (3) Screws (M5 or M6 x 4) supplied with the rack NOTE 98 To attach the brackets, use the M5 or M6 screws supplied with the rack.
4. Installing a Switch Figure 4-11 Installation location of the support brackets (1) Support bracket (2) Rack pillar NOTE Dotted lines (- - -) in the Figure indicate the boundary between units (U). Align the top of a support bracket with the boundary. Step 2 Attach crossbar A to brackets L and R.
4. Installing a Switch (2) Screws supplied with the support bracket (Two M4 x 10 screws) NOTE To attach crossbar A, use the M4 screws supplied with the support bracket. Step 3 Mount the Switch on the rack. Hold the handles and the bottom of the Switch, and then mount the Switch horizontally on the support brackets. Figure 4-13 Mounting a Switch on the rack The maximum weight of the AX6304S is 45 kg. The Switch must be installed and carried by at least three people.
4. Installing a Switch Step 4 Secure the Switch to the rack. Use the screws to secure the Switch to the rack pillar. Figure 4-14 Securing the Switch (1) Screws (M5 or M6 x 4) supplied with the rack Support the front and the back of the Switch until the screws have been tightened. If the Switch tilts, it could drop or fall, resulting in injury. In addition, other devices mounted in the same rack might be damaged. NOTE To secure a Switch to the rack, use the M5 or M6 screws supplied with the rack.
4. Installing a Switch Figure 4-15 Attaching crossbar B (1) Mounting hole 1 (2) Mounting hole 2 (3) Cross bar B (4) Thumb screw NOTE Securely tighten the thumb screws with your hand. 4.5.3 AX6308S Step 1 Attach a guide rail or a shelf to the rack. For the installation location of the guide rail, see Figure 4-17 Installation location of the guide rail.
4. Installing a Switch Figure 4-16 Installing a guide rail (1) Guide rail Figure 4-17 Installation location of the guide rail (1) Rubber pad (2) Guide rail (3) Rack pillar NOTE Dotted lines (- - -) in the Figure indicate the boundary between units (U). When attaching a guide rail, align the top of the guide rail with the boundary (U). NOTE Rubber pads are attached to the bottom of a Switch when it is shipped from the factory. The height of a rubber pad is 0.7 mm.
4. Installing a Switch Step 2 Mount the Switch on the guide rails or the shelf. Hold the bottom and the handles of the Switch when mounting the Switch. Figure 4-18 Mounting a Switch on the rack (1) Handles (2) Rack (3) Guide rail The maximum weight of the AX6308S is 64 kg. The Switch must be installed and carried by at least three people. Installing or carrying a Switch with too few people could result in the Switch being dropped or falling, possibly leading to injury.
4. Installing a Switch Figure 4-19 Mounting a Switch on the rack (1) Screws (M5 or M6 x 8) NOTE To secure a Switch to the rack, use the M5 or M6 screws supplied with the rack.
4. Installing a Switch 4.6 Connecting and disconnecting the power cable 4.6.1 Replacing the bracket preventing disconnection of the power cable (when a 200 V AC power cable is used) The bracket attached when a Switch is shipped from the factory supports only the supplied power cable. To connect the optional 200 V AC power cable to a Switch, use the bracket supplied with the power cable. NOTE If you have obtained your own 200 V AC power cable, do not use the bracket.
4. Installing a Switch Figure 4-21 Attaching the bracket (1) Bracket preventing disconnection of the power cable (2) Support A (3) Support B 4.6.2 Connecting and disconnecting the AC power cable (1) Connecting the AC power cable NOTE The figure below shows an example of connecting the 100 V AC power cable supplied with a Switch. Use the same procedure to connect a 200 V AC power cable. Step 1 Connect a power cable to the power connector.
4. Installing a Switch When using a Switch at 100 V AC, use the supplied power cable. Using another cable could result in fire or electric shock. In addition, do not use the supplied power cable with another switch. Doing so could result in fire or electric shock. When using a Switch in a 200 V AC environment, use only the separately sold ALAXALA power cable, or a power cable that meets ALAXALA specifications. Using another cable could result in fire or electric shock.
4. Installing a Switch the power cable. CAUTION To disconnect the power cable, set the switch of the power supply unit to be removed to OFF. 4.6.3 Connecting and disconnecting the DC power cable (1) Connecting the DC power cable Use the specified DC power cable. Using another cable could result in fire or electric shock. Connecting and disconnecting a DC power cable must be performed by a trained technician or maintenance personnel. The DC power cable is connected to the terminal board.
4. Installing a Switch Step 2 Remove the terminal board cover from the terminal board. Figure 4-26 Removing the terminal cover (1) Terminal cover Step 3 Remove the 0 V terminal, −48 V terminal, and ground terminal screws. Figure 4-27 Removing the screws (1) 0V terminal (2) −48 V terminal (3) Ground terminal (4) Screws (M6) NOTE If a two-hole type bracket (shown in the following figure) is used for the ground terminal, remove both screws of the ground terminal. Step 4 Loosen the cable clamp screws.
4. Installing a Switch Figure 4-28 Releasing the cable clamp (1) Cable clamp (2) Screws (M5) Step 5 Pass the DC power cable through the cable clamp, and then tighten the screws of the ground terminals. Figure 4-29 Securing the ground terminals (1) DC power cable (2) Cable clamp (3) Ground terminal (4) Screws (M6) If you use a DC power supply, always connect the ground terminals. Using the Switch without grounding could result in electric shock or failures due to electrical noise.
4. Installing a Switch Step 6 Tighten the 0 V terminal and −48 V terminal screws in that order. Figure 4-30 Securing the 0 V terminal and the -48 V terminal (1) 0V terminal (2) −48 V terminal (3) Screws (M6) Step 7 Secure the DC power cable with the cable clamp. (Tighten the cable clamp screws.) Figure 4-31 Securing the DC power cable (1) Cable clamp (2) Screws (M5) Step 8 Attach the terminal cover.
4. Installing a Switch Figure 4-32 Attaching the terminal cover (1) Terminal cover Step 9 Attach the terminal board cover.
4. Installing a Switch After connecting the DC power cable, attach the terminal board cover. Using the power supply unit without the cover could result in electric shock. (2) Disconnecting the DC power cable Reverse the steps described in (1) Connecting the DC power cable to remove the power cable. Connecting and disconnecting a DC power cable must be performed by a trained technician or maintenance personnel. The DC power cable is connected to the terminal board.
4. Installing a Switch 4.7 Attaching a wrist strap A Switch has a terminal for an antistatic wrist strap. The terminal supports 4 mm banana plugs. Use a 4 mm banana plug for the wrist strap terminal.
4. Installing a Switch 4.8 Inserting and removing memory cards To use a memory card, insert it in the management and switching unit. CAUTION Remove the memory card before moving the Switch. If a card is subjected to excessive force when the Switch is moved, the connector of the memory card slot might be damaged. (1) Inserting a memory card Insert a memory card into the slot until you hear a click, and then remove your fingers slowly. (Hold the memory card with the cut-off corner to the right.
4. Installing a Switch Figure 4-36 Checking the ACC LED CAUTION If the ACC LED is lit, the memory card is being accessed. While a memory card is being accessed, do not remove the memory card or turn off the power. Doing so might damage the memory card. In addition, some commands require a certain amount of time after being entered to finish accessing the card. Make sure that the memory card is no longer being accessed before removing the card or turning off the power.
4. Installing a Switch Figure 4-38 Removing a memory card CAUTION 118 When removing a memory card, do not forcibly pull out the card if it is locked. Doing so might damage the connector of the memory card slot.
4. Installing a Switch 4.9 Inserting and removing SFP transceivers SFP transceivers with a network interface unit attached can be inserted and removed while the Switch is on. (1) Inserting an SFP transceiver Keep the lever upright as shown in the figure, and insert the SFP transceiver until you hear a click.
4. Installing a Switch (1) Lever (2) SFP transceiver (3) Ethernet port (2) Removing an SFP transceiver Press the lever down in the direction of the arrow. While holding down the lever, pull out the SFP transceiver.
4. Installing a Switch 4.10 Inserting and removing XFP transceivers XFP transceivers with a network interface unit attached can be inserted and removed while the Switch is on. NOTE The following procedures describe how to insert and remove a type-A module. The same procedures apply to a type-B module. (1) Installing an XFP transceiver Keep the lever upright as shown in the figure, and insert the XFP transceiver until you hear a click.
4. Installing a Switch 4.11 Connecting operation terminals Connect an operation terminal to the CONSOLE port of the Switch. To do so, use an RS-232C crossover cable with 9-pin (female) D-sub connectors on both ends, and use #4-40 screws. Figure 4-44 Connecting the operation terminal (1) RS-232C cable (2) Operation terminal Step 1 Connect the RS-232C cable to the CONSOLE port of the Switch.
4. Installing a Switch NOTE After the cable is connected to the port, tighten the screws. Also make sure the cable is firmly connected. Step 2 In the same way, connect the RS-232C cable to the operation terminal.
4. Installing a Switch 4.12 Connecting interface cables (1) UTP cable Push the connector until you hear a click. Figure 4-46 Connecting a UTP cable (1) UTP cable (2) Tab (3) Ethernet port NOTE To detach the cable, hold the tab down and pull out the connector. (2) Fiber optic cable (LC duplex connector) Push the connector until you hear a click.
4. Installing a Switch NOTE For details about cleaning optical connectors, see A Cleaning Optical Connectors. (3) Fiber optic cable (LC simplex connector) Push the connector until you hear a click. Figure 4-48 Fiber optic cable (LC simplex connector) (1) Fiber optic cable (LC simplex connector) (2) Tab (3) Transceiver NOTE To detach the cable, hold the tab down and pull out the connector. NOTE For details about cleaning optical connectors, see A Cleaning Optical Connectors.
4. Installing a Switch 4.13 Turning the Switch on and off 4.13.1 AX6304S (AC power supply unit installed) (1) Turning the Switch on Step 1 Make sure the power supply unit is installed correctly. Figure 4-49 Checking the installation location of the power supply unit (1) Slot number (2) Power supply unit NOTE If you do not want a redundant power supply, install power supply units in PS1 and PS2. For a redundant power supply, install power supply units in all slots from PS1 to PS4.
4. Installing a Switch Figure 4-50 Turning on the power (1) Power switch NOTE Set all power switches to ON within five seconds of turning the first switch on. If you take longer than five seconds, the management and switching unit detects a power failure, and the failure information is displayed on the LCD. If this happens, take action as described in the following table. Display on the LCD Action E8 PS Msg=00000001 The Switch is ready. Set all power switches to ON.
4. Installing a Switch executed) and the memory card is not being accessed. Figure 4-51 Checking the LED (1) Management and switching unit (2) STATUS LED (3) ACC LED CAUTION When the ppupdate command is executed, the Switch restarts automatically. Do not turn off the Switch until it is restarted (until the STATUS LED on the management and switching unit changes from blinking green to constant green). Failure to do so could result in a Switch failure.
4. Installing a Switch Figure 4-52 Turning off the power (1) Power switch A Switch has multiple input power supplies. Before turning off the power, set all power switches of the Switch to OFF. 4.13.2 AX6304S (DC power supply unit installed) (1) Turning the Switch on Step 1 Make sure the power supply unit is installed correctly.
4. Installing a Switch Figure 4-53 Checking the installation location of the power supply unit (1) Power supply unit (2) Slot number NOTE If you do not want a redundant power supply, install the power supply unit in PS1. For a redundant power supply, install power supply units in both the PS1 and PS2 slots. NOTE The slot number of a power supply unit is located on the Switch. You can find the number at the bottom right of each power supply unit.
4. Installing a Switch Figure 4-54 Turning on the power (1) Circuit breaker NOTE Set all power switches to ON within five seconds of turning the first switch on. If you take longer than five seconds, the management and switching unit detects a power failure, and the failure information is displayed on the LCD. If this happens, take action as described in the following table. Display on the LCD Action E8 PS Msg=00000001 The Switch is ready. Set all circuit breakers to ON.
4. Installing a Switch (2) Turning off the power Step 1 Make sure the software is not being updated (the ppupdate command is not being executed) and the memory card is not being accessed. Figure 4-55 Checking the LED (1) Management and switching unit (2) STATUS LED (3) ACC LED CAUTION When the ppupdate command is executed, the Switch restarts automatically.
4. Installing a Switch Figure 4-56 Turning off the power (1) Circuit breaker A Switch has multiple input power supplies. Before turning off the power, set all circuit breakers of the Switch to OFF. 4.13.3 AX6308S (AC power supply unit installed) (1) Turning the Switch on Step 1 Make sure the power supply unit is installed correctly.
4. Installing a Switch Figure 4-57 Checking the installation location of the power supply unit (1) Slot number (2) Power supply unit NOTE If you do not want a redundant power supply, install the power supply units in PS1 and PS2. For a redundant power supply, install power supply units in the PS1 to PS4 slots. NOTE The slot number of a power supply unit is located on the Switch. You can find the number at the bottom left of each power supply unit.
4. Installing a Switch Figure 4-58 Turning on the power (1) Power switch NOTE Set all power switches to ON within five seconds of turning the first switch on. If you take longer than five seconds, the management and switching unit detects a power failure, and the failure information is displayed on the LCD. If this happens, take action as described in the following table. Display on the LCD Action E8 PS Msg=00000001 The Switch is ready. Set all power switches to ON.
4. Installing a Switch (2) Turning off the power Step 1 Make sure the software is not being updated (the ppupdate command is not being executed) and the memory card is not being accessed. Figure 4-59 Checking the LED (1) Management and switching unit (2) STATUS LED (3) ACC LED CAUTION When the ppupdate command is executed, the Switch restarts automatically.
4. Installing a Switch Figure 4-60 Turning off the power (1) Power switch A Switch has multiple input power supplies. Before turning off the power, set all power switches of the Switch to OFF. 4.13.4 AX6308S (DC power supply unit installed) (1) Turning the Switch on Step 1 Make sure the power supply unit is installed correctly.
4. Installing a Switch Figure 4-61 Checking the installation location of the power supply unit (1) Power supply unit (2) Slot number NOTE If you do not want a redundant power supply, install the power supply unit in PS1. For a redundant power supply, install power supply units in both the PS1 and PS2 slots. NOTE The slot number of a power supply unit is located on the Switch. You can find the number at the bottom right of each power supply unit.
4. Installing a Switch Figure 4-62 Turning on the power (1) Circuit breaker NOTE Set all power switches to ON within five seconds of turning the first switch on. If you take longer than five seconds, the management and switching unit detects a power failure, and the failure information is displayed on the LCD. If this happens, take action as described in the following table. Display on the LCD Action E8 PS Msg=00000001 The Switch is ready. Set all circuit breakers to ON.
4. Installing a Switch (2) Turning off the power Step 1 Make sure the software is not being updated (the ppupdate command is not being executed) and the memory card is not being accessed. Figure 4-63 Checking the LED (1) Management and switching unit (2) STATUS LED (3) ACC LED CAUTION When the ppupdate command is executed, the Switch restarts automatically.
4. Installing a Switch Figure 4-64 Turning off the power (1) Circuit breaker A Switch has multiple input power supplies. Before turning off the power, set all circuit breakers of the Switch to OFF.
4. Installing a Switch 4.14 Other operations (1) Operation management and configuration settings For details about the operation management and configuration settings, see the following manuals, as appropriate. (The number in the parentheses is the manual number.) z z z Manuals for operation management and configuration settings: Software Manual Configuration Guide Vol. 1 (AX63S-S001X) Software Manual Configuration Guide Vol. 2 (AX63S-S002X) Software Manual Configuration Guide Vol.
5. Adding and Replacing Optional Modules This chapter describes how to add and replace a fan unit, power supply unit, management and switching unit, and network interface unit. 5.1 Required tools 5.2 Read prior to operation 5.3 Replacing a fan unit 5.4 Adding or replacing a power supply unit 5.5 Adding or replacing a management and switching unit 5.
5. Adding and Replacing Optional Modules 5.1 Required tools The following tools are necessary to add, replace, or remove devices: No. 1 Phillips screwdriver Used to install or remove an optional module. No. 2 Phillips screwdriver Used to connect or disconnect a DC power cable, and to install or remove a single guide rail. No. 3 Phillips screwdriver Used to connect or disconnect a DC power cable. Antistatic wrist strap Used to protect the equipment from electrostatic discharge.
5. Adding and Replacing Optional Modules 5.2 Read prior to operation Adding or replacing optional modules must be performed by a trained technician or maintenance personnel. Adding or replacing a power supply unit requires connecting or disconnecting the power cable. If an untrained person performs the operation and mishandles the power cable, fire or electric shock could result. Also, mishandling other optional modules could result in injury or damage.
5. Adding and Replacing Optional Modules 5.3 Replacing a fan unit A fan unit can be replaced while the Switch is on. Replacing a fan unit must be performed by a trained technician or maintenance personnel. If another person performs the above and mishandles the fan unit, injury or damage could result. CAUTION When replacing a fan unit with the Switch on, you must remove and replace the unit within one minute.
5. Adding and Replacing Optional Modules Figure 5-2 Removing a fan unit (2) (1) Handle (2) Fan Immediately after you have moved the fan unit, the fan might be still rotating. While the fan blades are rotating, do no place your hands near them. Doing so might result in injury. Step 3 When the fan stops, remove the fan unit (remove it by holding the handle and supporting the bottom of the fan unit).
5. Adding and Replacing Optional Modules (1) Handle (2) Installing a fan unit Step 1 Insert a fan unit in a fan unit slot. Figure 5-4 Installing a fan unit (1) (1) Fan unit (2) Fan unit slot Step 2 Push the fan unit in as far as it will go, and then tighten the fan unit screw.
5. Adding and Replacing Optional Modules Figure 5-5 Installing a fan unit (2) (1) Screws NOTE Use a screwdriver to tighten the screws. Make sure the screws are firmly tightened.
5. Adding and Replacing Optional Modules 5.4 Adding or replacing a power supply unit A power supply unit can be added while the Switch is on. If the power supply is redundant, a power supply unit can be replaced while the Switch is on. Replacing a power supply unit must be performed by a trained technician or maintenance personnel. Adding or replacing a power supply unit requires connecting or disconnecting the power cable.
5. Adding and Replacing Optional Modules Figure 5-6 Turning off the power (1) Power switch (2) Power supply unit Step 2 Disconnect the power cable from the power supply unit you are replacing. (For details about how to disconnect the power cable, see 4.6 Connecting and disconnecting the power cable.) Figure 5-7 Disconnecting the power cable (1) Power cable When adding or replacing a power supply unit, disconnect the power cable from the power supply unit that will be replaced.
5. Adding and Replacing Optional Modules Step 3 Loosen the screws of the power supply unit. Figure 5-8 Removing a power supply unit (1) (1) Screws Step 4 Remove the power supply unit. (Pull the unit a little way toward you while holding the handles and supporting the bottom of the unit.
5. Adding and Replacing Optional Modules CAUTION When removing a power supply unit, install a blank panel. If you continue using the Switch without attaching a blank panel, the airflow in the Switch cannot be maintained. As a result, the temperature inside the Switch will rise, possibly resulting in a failure. In addition, the radio waves generated by the Switch might affect another device, or the radio waves generated by another device might affect the Switch, resulting in a malfunction.
5. Adding and Replacing Optional Modules Figure 5-11 Installing a power supply unit (2) (1) Screws NOTE Use a screwdriver to tighten the screws. Make sure the screws are firmly tightened. Step 3 Connect a power cable to the power supply unit. (For details about how to connect a power cable, see 4.6 Connecting and disconnecting the power cable.) 5.4.
5. Adding and Replacing Optional Modules Figure 5-12 Turning off the power (1) Circuit breaker (2) Power supply unit Step 2 Set the circuit breaker of the power supply facility to OFF to turn off the power. The circuit breaker of the power supply facility must be set to OFF. Adding or replacing a DC power supply unit with the circuit breaker set to ON could result in fire or electric shock. Step 3 Disconnect the power cable from the power supply unit you are replacing.
5. Adding and Replacing Optional Modules Figure 5-13 Disconnecting the power cable (1) Power cable Step 4 Loosen the screws of the power supply unit. Figure 5-14 Removing a power supply unit (1) (1) Screws Step 5 Remove the power supply unit. (Pull the unit a little way toward you while holding the handles and supporting the bottom of the unit.
5. Adding and Replacing Optional Modules Figure 5-15 Removing a power supply unit (2) (1) Handles The weight of a DC power supply unit is 5.6 kg and the front-to-back measurement is 163 mm. When removing a DC power supply unit from a Switch, support the DC power supply unit itself. If you pull the unit carelessly, it might fall, possibly resulting in injury. CAUTION When removing a power supply unit, install a blank panel.
5. Adding and Replacing Optional Modules Figure 5-16 Installing a power supply unit (1) (1) Power supply unit (2) Power supply unit slot Step 2 Push the power supply unit in as far as it will go, and then tighten the power supply unit screws. Figure 5-17 Installing a power supply unit (2) (1) Screws NOTE 158 Use a screwdriver to tighten the screws. Make sure the screws are firmly tightened.
5. Adding and Replacing Optional Modules Step 3 Connect a power cable to the power supply unit. (For details about how to connect a power cable, see 4.6 Connecting and disconnecting the power cable.) Make sure the circuit breaker of the power supply facility is set to OFF before connecting or disconnecting the DC power cable. Connecting or disconnecting the cable with the circuit breaker of the power supply facility set to ON could result in fire or electric shock.
5. Adding and Replacing Optional Modules 5.5 Adding or replacing a management and switching unit Adding or replacing a management and switching unit must be performed by a trained technician or maintenance personnel. If another person performs the above and mishandles the management and switching unit, injury or damage could result. NOTE When adding a network interface unit, remove the blank panel. Make sure you keep the blank panel you remove.
5. Adding and Replacing Optional Modules Figure 5-18 Overview of removing a management and switching unit Step 1 Make sure the management and switching unit you are removing has been turned off (when the STATUS LED is on, the unit is turned on; when it is off, the unit is off).
5. Adding and Replacing Optional Modules Figure 5-19 Checking the STATUS LED (1) STATUS LED (2) Management and switching unit Step 2 Turn off the management and switching unit if the power is being supplied (execute the Inactivate operation). NOTE For details about the Inactivate operation, see 11 Switch Management in the Software Manual Configuration Guide Vol. 1. Step 3 Loosen the screws of the management and switching unit.
5. Adding and Replacing Optional Modules Step 4 Open the right and left levers of the management and switching unit at the same time (the unit comes out toward you about 15 mm). Figure 5-21 Removing a management and switching unit (2) (1) Lever NOTE Use the levers so that the connectors on the optional module and the Switch can be disengaged correctly. When moving a lever, move the right and left levers slowly and at the same time without exerting excessive force.
5. Adding and Replacing Optional Modules (2) Side Components in a management and switching unit might be very hot. Do not touch any components with your hands. Doing so could result in burns. CAUTION When removing a management and switching unit, install a blank panel. If you continue using the Switch without attaching a blank panel, the airflow in the Switch cannot be maintained. As a result, the temperature inside the Switch will rise, possibly resulting in a failure.
5. Adding and Replacing Optional Modules Figure 5-23 Installation overview Step 1 Insert a management and switching unit halfway into the slot for it. (Do this while holding the sides of the unit.
5. Adding and Replacing Optional Modules Figure 5-24 Installing a management and switching unit (1) (1) Management and switching unit (2) Management and switching unit slot Step 2 While holding the levers, push the unit carefully until the levers touch the Switch. The levers must be opened parallel to the direction of insertion.
5. Adding and Replacing Optional Modules Step 3 Close the levers of the management and switching unit. (The unit is inserted completely.) Figure 5-26 Installing a management and switching unit (3) (1) Lever CAUTION Use the levers so that the connectors on the optional module and the Switch will be engaged correctly. When moving the levers, move them slowly (one second or longer) without exerting any force. Failure to do this could result in a Switch malfunction or fault.
5. Adding and Replacing Optional Modules NOTE Use a screwdriver to tighten the screws. Make sure the screws are firmly tightened. Step 5 Turn on the management and switching unit. (Execute the Activate operation.) NOTE For details about the Activate operation, see 11 Switch Management in the Software Manual Configuration Guide Vol. 1. NOTE Executing the Activate operation starts loading of the software.
5. Adding and Replacing Optional Modules the Activate operation). 4. Match the software version used in the standby system with the version used in the active system (use the ppupdate command). 5. Synchronize the configuration, user account, password, and license key settings of the standby system with the settings of the active system (use the synchronize command). 6.
5. Adding and Replacing Optional Modules 5.6 Adding or replacing a network interface unit Adding or replacing a network interface unit must be performed by a trained technician or maintenance personnel. If another person performs the above and mishandles the network interface unit, injury or damage could result. NOTE When adding a network interface unit, remove the blank panel. Make sure you keep the blank panel you remove. 5.6.
5. Adding and Replacing Optional Modules the STATUS LED is on, the unit is on; when it is off, the unit is off). Figure 5-29 Checking the STATUS LED (1) STATUS LED (2) Network interface unit Step 2 Turn off the network interface unit if power is being supplied (execute the Inactivate operation). NOTE For details about the Inactivate operation, see 11 Switch Management in the Software Manual Configuration Guide Vol. 1. Step 3 Loosen the screws of the network interface unit.
5. Adding and Replacing Optional Modules Figure 5-30 Removing a network interface unit (1) (1) Screws CAUTION Loosen the screws completely. If the screws are not loose enough, the network interface unit might be damaged when the levers are opened. Step 4 Open the right and left levers of the network interface unit at the same time (the unit comes out toward you about 15 mm).
5. Adding and Replacing Optional Modules Step 5 Remove the network interface unit. (Pull the unit a little way toward you while holding the levers and supporting the sides.) Figure 5-32 Removing a network interface unit (3) (1) Lever (2) Side The components in a network interface unit might be very hot. Do not touch any components with your hands. Doing so could result in burns. CAUTION When removing a network interface unit, install a blank panel.
5. Adding and Replacing Optional Modules NOTE For details about steps 1 to 5 in the figure, see the description of the steps that follow Figure 5-33 Installation overview. Figure 5-33 Installation overview Step 1 Insert a network interface unit halfway into the slot for it. (Do this while holding the sides of the unit.
5. Adding and Replacing Optional Modules Figure 5-34 Installing a network interface unit (1) (1) Network interface unit (2) Network interface unit slot Step 2 While holding the levers, push the unit carefully until the levers touch the Switch. The levers must be opened parallel to the direction of insertion.
5. Adding and Replacing Optional Modules CAUTION While holding the levers, push the network interface unit carefully until the levers touch the Switch. Failure to do this could result in a Switch malfunction or fault. CAUTION Open the levers as shown in the figure when you install a network interface unit. If the levers are closed or opened too much, they might be damaged when you install the unit. Step 3 Close the levers of the network interface unit. (The unit is inserted completely.
5. Adding and Replacing Optional Modules Figure 5-37 Installing a network interface unit (4) (1) Screws NOTE Use a screwdriver to tighten the screws. Make sure the screws are firmly tightened. NOTE If you install a network interface unit (NIF) while the Switch is on, the NIF is turned on automatically when the NIF is installed. Note, however, that if no power enable is set in the configuration, the NIF is not turned on automatically. Set power enable, and then turn on the power.
5. Adding and Replacing Optional Modules Figure 5-38 Overview of removing a network interface unit Step 1 Make sure the network interface unit you are removing has been turned off (when the STATUS LED is on, the unit is on; when it is off, the unit is off).
5. Adding and Replacing Optional Modules Step 2 Turn off the network interface unit if power is being supplied (execute the Inactivate operation). NOTE For details about the Inactivate operation, see 11 Switch Management in the Software Manual Configuration Guide Vol. 1. Step 3 Loosen the screws of the network interface unit. Figure 5-40 Removing a network interface unit (1) (1) Screws CAUTION Loosen the screws completely.
5. Adding and Replacing Optional Modules Figure 5-41 Removing a network interface unit (2) (1) Lever NOTE Use the levers so that the connectors on the optional module and the Switch can be disengaged correctly. When moving a lever, move the right and left levers slowly and at the same time without exerting excessive force. Step 5 Remove the network interface unit. (Pull the unit a little way toward you while holding the levers and supporting the sides.
5. Adding and Replacing Optional Modules (1) Lever (2) Side The components in a network interface unit might be very hot. Do not touch any components with your hands. Doing so could result in burns. CAUTION When removing a network interface unit, install a blank panel. If you continue using the Switch without attaching a blank panel, the airflow in the Switch cannot be maintained. As a result, the temperature inside the Switch will rise, possibly resulting in a failure.
5. Adding and Replacing Optional Modules Figure 5-43 Installation overview Step 1 Make sure a tray is installed in the network interface unit slot (the tray is secured with screws).
5. Adding and Replacing Optional Modules Figure 5-44 Checking a tray (1) Screws (2) Tray NOTE For details about how to install a tray, see 5.6.3 Installing and removing a single-guide rail. Step 2 Insert a network interface unit halfway into the slot for it. (Do this while holding the sides of the unit.
5. Adding and Replacing Optional Modules (2) Network interface unit slot Step 3 While holding the levers, push the unit carefully until the levers touch the Switch. The levers must be opened parallel to the direction of insertion. Figure 5-46 Installing a network interface unit (2) (1) Contact point (2) Lever CAUTION While holding the levers, push the network interface unit carefully until the levers touch the Switch. Failure to do this could result in a Switch malfunction or fault.
5. Adding and Replacing Optional Modules Figure 5-47 Installing a network interface unit (3) (1) Lever CAUTION Use the levers so that the connectors on the optional module and the Switch will be engaged correctly. When moving the levers, move them slowly (one second or longer) without exerting any force. Failure to do this could result in a Switch malfunction or fault. Step 5 Tighten the screws of the network interface unit.
5. Adding and Replacing Optional Modules NOTE If you install a network interface unit (NIF) while the Switch is on, the NIF is turned on automatically when the NIF is installed. Note, however, that if no power enable is set in the configuration, the NIF is not turned on automatically. Set power enable, and then turn on the power. For details about the power enable command, see 12. Management of BSU/NIF in the Software Manual Configuration Guide Vol. 1. 5.6.
5. Adding and Replacing Optional Modules Step 2 Remove the tray. (Hold inside the tray and pull it a little way toward you, and then remove it while supporting the bottom of the tray.) Figure 5-50 Removing a tray (2) Step 3 Remove the three screws securing the single-guide rail. Figure 5-51 Removing a single-guide rail (1) (1) Single-guide rail (2) Screws Step 4 Remove the single-guide rail from the tray.
5. Adding and Replacing Optional Modules Figure 5-52 Removing a single-guide rail (2) NOTE Make sure you keep the single-guide rail and the screws you remove. Step 5 Install the tray in the network interface unit slot. Figure 5-53 Installing a tray (1) (1) Tray (2) Network interface unit slot Step 6 Tighten the screws of the tray.
5. Adding and Replacing Optional Modules Figure 5-54 Installing a tray (2) (1) Screws (2) Tray (2) Installing a single-guide rail To install the single-guide rail, reverse the steps described in (1) Removing a single-guide rail.
5.
Appendix Appendix A.
A. Cleaning Optical Connectors A. Cleaning Optical Connectors A.1 Cleaning the optical connectors of transceivers To clean the optical connector for the transceiver, follow the procedure below. The fiber optic cable uses a laser beam that is colorless and transparent, and invisible to the eye. Never look directly into the optical transceiver. NOTE The following is an example of cleaning the optical connector of an SFP transceiver.
A. Cleaning Optical Connectors Step 2 Check the tip of the optical connector cleaner (stick-type) for irregularities, such as lint, dirt, or other foreign matter. Figure A-2 Checking the optical connector cleaner (1) Optical connector cleaner (stick-type) (2) Part to check CAUTION Before cleaning, make sure that the tip of the optical connector cleaner is clean and free of defects, such as lint, dirt, or other foreign substances. Using a cleaner with a defective tip might damage the ferrule tip.
A. Cleaning Optical Connectors NOTE For instructions on how to use the optical connector cleaner, see the documentation for the optical connector cleaner. A.2 Cleaning fiber optic cables To clean fiber optic cables, follow the procedure below. The fiber optic cable uses a laser beam. (Laser beams are colorless and transparent, and invisible to the eye.) Never look directly into the optical transceiver. Step 1 Use an air duster to remove dirt and dust from the tip of the connector.
A. Cleaning Optical Connectors Step 2 Use an optical connector cleaner (reel-type) to clean any dirt from the ferrule tip. Figure A-5 Cleaning the ferrule tip CAUTION Always use a dedicated optical connector cleaner. If you use another type of cleaner, the ferrule tip might be damaged. CAUTION Do not apply excessive pressure when cleaning. Doing so might damage the ferrule tip. NOTE For instructions on how to use the optical connector cleaner, see the documentation for the optical connector cleaner.