MA-2 AX63S-H001-50X ALAXALA AX6300S Hardware Instruction Manual Corrections Released July 23, 2010 (Edition 2) 1
MA-2 AX63S-H001-50X Preface This document contains corrections for the AX6300S Hardware Instruction Manual (Copyright (C) 2006, 2009, ALAXALA Networks Corporation. All rights reserved.). If you intend to use the Switch, please read this document carefully. This document applies to the following manual: Item No. 1 Manual name ALAXALA AX6300S Hardware Instruction Manual Manual number AX63S-H001-50X Trademarks - Ethernet is a product name of Xerox Corporation.
MA-2 AX63S-H001-50X Contents Safety Information.................................................................................................................................... 4 1. Components Overview.......................................................................................................................... 5 2. Preparation for Installation .................................................................................................................... 7 3.
MA-2 AX63S-H001-50X Safety Information The following note has been added after "Avoid looking directly at laser beams.". Addition: Do not touch the SFP-T transceiver during operation or just after operation has stopped. During operation and when a link is being established, the temperature of the SFP-T transceiver can rise to 65oC. Do not touch the SFP-T transceiver while it is operating and just after it has stopped. Doing so could result in burns. Caution: Hot (During operation, all sides are very hot.
MA-2 AX63S-H001-50X 1. Components Overview 1.7 Transceiver 1.7.1 SFP Table 1-21 has been corrected as follows.
MA-2 AX63S-H001-50X A description of the SFP-T transceiver has been added as (10). Addition: (10) SFP-T Figure 1-42a External appearance (1) (2) (1) Label: ALAXALA SFP-T Label color: White (2) Lever color: Yellow The SFP-T transceiver is supported by NH1G-24S. 1.7.2 XFP The explanation in (2) XFP-LR transceiver has been corrected as follows.
MA-2 AX63S-H001-50X 2. Preparation for Installation 2.4 Power supply facility 2.4.1 Power supply facility for 100 V AC Table 2-5 Inrush current has been corrected as follows. Correction: Table 2-5 Inrush current Current (peak value) 30 A 15 A Time 10 ms or less 150 ms or less 2.4.2 Power supply facility for 200 V AC Table 2-9 Inrush current has been corrected as follows. Correction: Table 2-9 Inrush current Current (peak value) 30 A 15 A Time 10 ms or less 150 ms or less 2.4.
MA-2 AX63S-H001-50X 3. Preparation of Interface Cables and Terminals 3.1 List of interface cables Table 3-1 has been corrected as follows.
MA-2 AX63S-H001-50X Port Transceiver Interface Cable Connector Multiple-terminal mode fiber optic cable (core/cladding diameter = 62.
MA-2 AX63S-H001-50X 4. Installing a Switch 4.9 Inserting and removing SFP transceivers The explanation about inserting and removing SFP transceivers has been corrected as follows. Correction: SFP transceivers with a network interface unit attached can be inserted and removed while the Switch is on. 4.9.
MA-2 AX63S-H001-50X Figure 4-40 Inserting an SFP transceiver (lower port) (3) (1) (2) (1) Lever (2) SFP transceiver (3) Ethernet port (2) Removing an SFP transceiver Press the lever down in the direction of the arrow. While holding down the lever, pull out the SFP transceiver.
MA-2 AX63S-H001-50X 4.9.2 Inserting and removing an SFP-T transceiver During operation and when a link is being established, the temperature of the SFP-T transceiver can rise to 65oC. Do not touch the SFP-T transceiver while it is operating and just after it has stopped. Doing so could result in burns. When you remove the SFP-T transceiver, use the procedure below. Failure to do so could result in burns.
MA-2 AX63S-H001-50X Figure 4-41b Inserting an SFP transceiver (lower port) (3) (1) (2) (1) Lever (2) SFP transceiver (3) Ethernet port (2) Removing an SFP-T transceiver Press the lever down in the direction of the arrow. While holding the lever, pull out the SFP transceiver.
MA-2 AX63S-H001-50X 4.12 Connecting interface cables The explanation about connecting a UTP cable has been corrected as follows. Correction: (1) UTP cable Push the connector until you hear a click. Figure 4-46 Connecting a UTP cable (1) (2) (3) (1) UTP cable (2) Tab (3) Ethernet port The above figure shows an example of inserting a UTP cable into the upper Ethernet port of the network interface unit. Use the same procedure to connect a UTP cable to the SFP-T transceiver.
MA-2 AX63S-H001-50X 5. Adding and Replacing Optional Modules 5.5 Adding or replacing a management and switching unit The explanation, notes, and figures in (2) Installing a management and switching unit have been corrected as follows. Correction: (2) Installing a management and switching unit A management and switching unit can be installed while the Switch is on. Note, however, that the procedure varies depending on whether the Switch is on or off.
MA-2 AX63S-H001-50X Figure 5-23 Installation overview Start Step 1: Partially insert the MSU. Step 2: Insert the MSU until the lever touches the Switch. Step 3: Close the lever of the MSU. Step 4: Tighten the screws of the MSU. Is the MSU being inserted while the Switch is on? No Turn on the Switch. Yes For details about how to turn on the Switch, see 4.13 Turning on and off the Switch. Step 5: Turn on the MSU.
MA-2 AX63S-H001-50X The description of (2) Installing a management and switching unit (step 6) has been corrected as follows. Correction: Step 6 Restore the operation information. Because the restoration procedure is different for the active system and the standby system, make sure you perform the appropriate procedure. 6-1 Restoring the management and switching unit of the active system 1. Restore the operating information from the file you have backed up. (Use the restore command.