Specifications
Unpacking
/
Setting
Up
6.
Unpacking
/
Setting Up
6.1
Transportation damage?
Notify carrier (forwarding merchant, railroad) etc.
Compile a damage report.
Before return delivery:
Inform dealer or manufacturer
(Small problems can often be dealt with on the spot).
6.2
Contents
2
Coupling Nuts
(E),
4
Hose clamps,
6
(already assembled) 1 Instruction Manual
2
Plug pieces
(D),
1 Warranty Card
(already assembled)
(please
fill
out and return)
C
E
2
Hose fittings
for hoses 8 mm
0
(B),
2
Hose fittings
for hoses 12 mm
0
(C)
6.3
Ambient conditions according to
EN
61010
indoors, max. 2000 meters above sea level,
ambient temperature
5
...
40"
C,
relative humidity max. 80%/31
"C
(+
50%/40°C)
excess voltage category
I
I, contamination level
2
6.4
Resting time after transportation
(only for refrigerated circulators)
As we can unfortunately not guarantee that our refrigerated
circulators are always transported according to our recom-
mendations (i.e. upright), lubrication oil can leak from the
compressor into the cooling circuit.
If the refrigerated circulator is started up whilst still in this
state, the compressor may be damaged to the lack of oil.
Therefore:
!
Rest the unit for
24
hours after setting up.
6.5
Ventilation
Keep all ventilation grids (on front and rear) free from
obstruction to ensure unhindered air circulation.
(
Blocked ventilation grids lead to increased unit
=
heating which in turn reduces the cooling capacity
and thus impairs correct functioning.