BS5839-1:2002 recommends that certificates be issued for all aspects of the fire alarm system including design,
installation, commissioning, acceptance, verification (optional) and maintenance. Therefore, before this user
m
anual is handed over, the following commissioning certificate and the installation certificate (overleaf) should
be completed as appropriate by the relevant installation/commissioning engineer(s). Please ensure that the
System Set-Up Data Chart (page 13) and the relevant parts of the Fire Alarm Log Book (page 14) are also
completed as appropriate. For countries outside the UK, different certification requirements may apply.
Certificate
of COMMISSIONING
for the fire alarm system at:
Address:
I/we being the competent person(s) responsible (as indicated by my/our signatures below) for the commissioning of the fire
alarm system, particulars of which are set out below, CERTIFY that the said work for which I/we have been responsible
complies to the best of my/our knowledge and belief with the specification described below and with the recommendations
of Clause 39 of BS5839-1: 2002, except for the variations, if any, stated in this certificate.
Name (in block letters):
Position (in block letters):
Signature:
Date:
For and on behalf of:
Address & postcode:
The extent of the liability of the signatory is limited to the system described below.
Extent of system covered by this certificate:
Variations from the recommendations of Clause 39 of BS5839-1:2002 (see BS5839-1:2002, Clause 7):
All equipment operates correctly
Installation work is, as far as can be reasonably ascertained, of an acceptable standard.
The entire system has been inspected and tested in accordance with the recommendations of 39.2c of BS5839-1:2002.
The system performs as required by the specification prepared by:
a copy of which I/we have been given.
Taking into account the guidance contained in Section 3 of BS 5839-1:2002, I/we have not identified any obvious
potential for an unacceptable rate of false alarms.
The documentation described in Clause 40 of BS5839-1:2002 has been provided to the user.
The following work should be completed before/after (delete as applicable) the system becomes operational:
The following potential cause(s) of false alarms should be considered at the time of the next service visit:
Before the system becomes operational, it should be soak tested in accordance with the recommendations of 35.2.6 of
BS5839-1:2002 for a period of: _____________ (enter a period of either one week, such period as required by the specification,
or such period as recommended by the signatory of this certificate, whichever is the greatest, or delete if not applicable).