Installation manual

031-171-C0-003 Rev. C 5
Power Systems
List of Figures
1.0 Overview .................................................................................................. 12
Fig. 1-1 MiniBay RMB-E-911-A48 and -B Cabinets (front view) ............................................. 12
Fig. 1-2 MiniBay RMB-E-911-C Enclosure (front and rear views) ..........................................13
Fig. 1-3 System Wiring Schematic ‘A48’ Configuration ........................................................ 17
Fig. 1-4 System Wiring Schematic ‘B’ Configuration............................................................18
Fig. 1-5 System Wiring Schematic ‘C’ Configuration ............................................................19
2.0 Site Preparation ....................................................................................... 20
Fig. 2-1 Swing Arc of Enclosure door ................................................................................... 21
Fig. 2-2 Polymer Precast Pad for Single-wide Enclosure .....................................................22
Fig. 2-3 Pad Dimensions for Single-wide Enclosure .............................................................22
Fig. 2-4 Pad Frame Template-Single MiniBay ...................................................................... 23
Fig. 2-5 Suggested Grounding Method .................................................................................24
3.0 Installation ................................................................................................ 25
Fig. 3-1 Lifting arrangement (without side chamber) .............................................................25
Fig. 3-2 Functional Diagram of the RMB-E-911 Air Conditioning System ..............................28
Fig. 3-3 Air Conditioner Control Board.................................................................................. 29
Fig. 3-4 Air Conditioner Wiring Diagram ...............................................................................30
Fig. 3-5 19” Swing Rack, RMB-E-911-C ...............................................................................33
Fig. 3-6 Battery Installation (RMB-E-911-B) .........................................................................34
Fig. 3-7 24VDC Connections (RMB-E-911-C) .......................................................................35
Fig. 3-8 Service Power Breaker Box (RMB-E-911-B) ............................................................36
Fig. 3-9 48VDC Connections (RMB-E-911-C and -A48) ........................................................ 37