Installation manual
34 031-171-C0-003 Rev. C
3.0 Installation, cont.
3.6 Battery Installation (RMB-E-911-B)
1 Remove the front battery enclosure cover and set aside.
2 Slide the battery tray towards the front of the enclosure until the tray locks into place.
3 Place two Marathon ‘M’ series batteries onto the battery tray with the connections facing out.
4 Wire in accordance with the diagram below.
Marathon ‘M’ Series Battery
POS
POSNEG
NEG
M12V40F
100A
Fuse
M12V40F
Fig. 3-6, Battery Installation (RMB-E-911-B)
Threaded Battery Post
Fuse
Ring Terminal
Isolation Washer
Flat Washer
Bolt
Lock Washer
Fuse Installation Detail
Replacement P/N 460-270-10
Max torque
is 75 in. lbs.,
+/- 3 in. lbs.
Over-torque may
crack isolation
washer.










