Installation manual

20 031-171-C0-003 Rev. C
2.0 Site Preparation
2.1 General Information
Description
This document describes the installation procedures for the RMB-E-911-B and -C enclosures. The
process of installing the enclosure(s) are broken into four discrete procedures. If viewing this document
on-line, click a section below (blue text) to jump directly to it.
Site Selection
MiniBay Installation
Battery Installation and Connection
Utility Power Connection
2.2 Required tools and materials
For the following procedures, the installer(s) will need the following tools and materials on hand.
Key to enclosure doors (p/n 964-022-10 — Pin Allen type, included)
Battery Cabling Kit (included only for RMB-E-911-B)
Crane to lift enclosure from shipping pallet and place on pedestal (not included)
Digital RMS voltmeter (not included)
Torque wrench with insulated handle and 7/16” socket (not included)
7/16” box-end wrench (not included)
NO-OX or other suitable corrosion inhibiting agent (not included)
Silicone sealant (GE RTV123, not included)
“Pour in place” pad template (optional)
Precast pad (optional)
Concrete pad mounting hardware (optional)