Operator`s manual

OPERATION
EM 1700,2200,2200F,2500 04/09 Operation Section 4-14
OPERATION
© 2009 Alamo Group Inc.
5. Transport Locks
a. Always install the Transport Cylinder stops on the Earthmaster before transporting the Earthmas-
teron the road.
6. 6. Hydraulics/ Sequence Valve
a. a. The sequence valve comes factory set to activate at 1800 PSI.
b. b. When hydraulic pressure is applied to the main lift circuit the main lift cylinders on the axle will
beginto lift the unit. When the Main lift cylinders reach full extension, the sequence valve diverts
the hydraulicflow to the tongue cylinder to level the unit.
c. c. When hydraulic pressure is reversed, the tongue cylinder will retract lowering the front of the
Earthmaster.When the tongue cylinder is fully retracted the sequence valve diverts the hydraulic
flow back to the mainlift cylinders allowing them to lower the unit into the ground.
d. d. NOTE: The raising and lowering of the unit can be reversed at any time during thesequence
without causing problems.
9. PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided. OPS-U-0029
Always disconnect the main PTO Driveline from the Tractor before performing service on
the Implement. Never work on the Implement with the tractor PTO driveline connected and
running. Rotating Parts, Blades or Drivelines could turn without warning and cause
immediate entanglement, injury or death.
(S3PT-11)