Operator`s manual

ASSEMBLY
EM 1700,2200,2200F,2500 04/09 Assembly Section 3-33
© 2009 Alamo Group Inc.
ASSEMBLY
DEALER ASSEMBLY PREPARATION CHECKLIST FOR THE EARTH MASTER
Item Completed
1 All parts are assembled or accounted for.
2 The Operator’s Manual is in the manual canister
3 The serial number tag is in place and readable
4 All Safety warning decals are on the unit, readable and in good condition
5 The SMV sign is securely attached to the implement
6 The safety tow chain is properly attached to the implement tongue
7 The tongue jack is in place on the implement
8 All nuts, bolts and fasteners are properly installed and tightened to the
specified torque
9 All hydraulic fittings are tight
10 No oil leaks are present
11 All cylinders and hoses are filled with oil
12 The hydraulic hoses are routed correctly and do not rub against sharp edges
13 Electrical connections are secure
14 Implement lights operate properly
15 The tires are properly inflated to the recommend air pressure
16 The wheel lug bolts are tight
17 The tires properly clear implement frame and discs
18 The wheel hub bearings are properly greased
19 All pivot points have been properly lubricated
20 Does the implement paint look complete and acceptable