Operator`s manual
ASSEMBLY
EM 1700,2200,2200F,2500 04/09 Assembly Section 3-25
© 2009 Alamo Group Inc.
ASSEMBLY
INSTALLING SHANK MOUNT TUBES
1. Place leveler mount plates (11) on top of V-ripper frame.
2. Place mid mount light brackets (18) on top of the inner mounts. (All models)
3. Place mid mount light brackets (18) on top of the outer mounts. (2200F & 2500)
4. Align mount plates and light brackets with correct holes depending on shank spacing. See diagram on
page3-19. Install three 3/4” x 11" GR5 bolts (12) through the forward holes of mounts and through the V-
ripper frame. See diagram on page 3-20.
5. Install lower mount plates (11) on bolt end and retain with 3/4” lock washer (10) and 3/4” lock washer
(10)and 3/4” nut (9).
6. Align holes on mount extension (2) with holes on the inner two mount plates.
7. Install one 3/4” x 12" GR5 bolt (13) and two 3/4” x 3" GR5 bolts (8) as shown. Retain with 3/4” lock
washer(10) and 3/4” nut (9).
8. Align holes on leveler mount (3) with holes on extension mounts.
9. Install four 3/4” x 3" GR5 bolts (8) and retain with 3/4” lock washer (10) and 3/4” nut (9).
10. Align holes on leveler mount (3) with holes on outer mount plates.
11. Install one 3/4” x 12" GR5 bolt (13) and two 3/4” x 3" GR5 bolts (8) as shown. Retain with 3/4” lock
washer(10) and 3/4” nut (9).
12. Install stop height bushing (16) into each leveler mount using one 5/8” x 5" GR8 bolt (14) and top lock
nut(15).
13. Install leveler tubes (1) in leveler mounts (3) by using pivot pin (5) and lynch pin (4).
14. Set tension on coil tine by installing down pressure springs (7) on leveler tubes and tightening down eye
bolt(6) using two 5/8” nuts (17) until there is 3" of thread out the back of mount.