Operator`s manual
ASSEMBLY
EM 1700,2200,2200F,2500 04/09 Assembly Section 3-11
© 2009 Alamo Group Inc.
ASSEMBLY
RUN FOLDING WING HYDRAULIC HOSES (2200F or 2500)
NOTE: While running hydraulic hoses it may be helpful to lay out all hoses to each location before installing. It
may also be helpful after laying out hoses to remove the color markings from each end of one hose in each set
of two.This will be helpful when connecting hoses to cylinders and fittings for proper function. Example: Hoses
with markings to base end of cylinder and hoses with no markings to rod end of cylinder.
1. Start by running green tagged hoses up through retaining rings on right hand side of tongue
2. Then run green hoses through hole on front mainframe just below turnbuckle. (Run hoses through black
Kevlar sleeve provided and ty-rap to hold in place. Kevlar sleeve should be attached to hoses where hoses
pass through hole in mainframe to prevent premature hose wear.)
3. Install cross fittings (2467106) to green hoses4.Run red tagged hoses through center tube of main disc
frame.Note: May need to use an electric wire fish to tie hoses to and then pull through.
4. Connect red hoses to cross fitting on the opposite side of green hoses6.Install orange tagged hoses to
other two ports on cross fitting and through hose retainers in V-ripper frame to the disc wing cylinders.
Retain hoses to disc frame using the 12 – 24" ty-raps.
5. Run red tagged hoses through opening in rear mainframe next to the main disc frame cylinder.
6. Install T-fittings (00726792) to red hoses.
7. Run blue tagged hoses to V-ripper cylinders.
8. Check all fittings to make sure all connections are on tight.11.Cycle system multiple times to remove all air
from lines to insure proper function of sequence valve.