Installation Sheet

STEP 27
Tighten xture coupler set screws using supplied 3/32” Allen wrench. Fixture coupler set screws have
thread lock already applied at factory. See Diagram K.
STEP 28
Apply supplied liquid thread lock (part D) to all ttings including xture coupler and screw collar loop
ttings.
Never attach the chandelier to the ALL1000 improperly. Failure to secure the xture coupler set screws
and properly apply thread lock could cause the chandelier to fall, which could cause death, personal
injury, and/or property damage.
STEP 29
Replace canopy and screw collar ring. Conrm adjustment of canopy and telescopic conduit assembly
allows contact plates to meet before the canopy touches the ceiling. See Diagram K.
Never allow the chandelier canopy to make contact with the ceiling before the contact plates meet. is
could interfere with the automatic shuto system and could cause the chandelier to fall, which could
cause death, personal injury, and/or property damage.
STEP 30
Conrm winch cable still hangs plumb through center of hole in top contact plate on ceiling box. See
STEP 9 and Diagram E.
STEP 31
Operate ALL1000 to the CEILING POSITION. Test lights and call Aladdin Light Lift (877) 287-4601
with any questions regarding installation and/or operation of ALL1000.
Bottom Screw Collar Ring
Canopy
Tighten Set
Screws with
3/32” Allen
Wrench
Diagram K
Bottom Contact
Plate Must Meet
Top Contact Plate
Before Canopy
Touches Ceiling