Technical Specifications
Data sheets are subject to change without notice. For the latest version, please check the product page at www.tccmaterials.com
1. Remove all loose or unsound materials. Thoroughly clean
surface of dirt, dust, grease, paint, or other contaminants
before patching, topping, or placing overlays.
2. Smooth troweled or dense concrete surfaces must be
mechanically roughened to ensure proper bond adhesion.
3. Just prior to application, pre-dampen surface to be repaired
with clean water to saturated surface dry (SSD) condition with
no standing water remaining.
Note: It is the responsibility of the installer/applicator to ensure
the suitability of the product for its intended use.
Mixing
1. Use cool, potable water, clean tools and clean containers. No
bonding additive is needed.
2. Mix only the amount that can be applied within the 30 minute
working time.
3. Always stir the powder into the liquid and mix with a paddle
mixer on a drill or mechanical batch mixer. Avoid highspeed
mechanical mixing which can entrap air into the mixture.
Smaller amounts can be mixed by hand (1 lb. of powder uses
approximately 2.4 oz. of water).
4. Mix to a uniform, lump-free, putty-like consistency,
approximately 2-3 minutes.
5. Warmer temperatures will reduce the working time. The
addition of cold water at high temperatures, or warm water in
low temperatures will aid in adjusting the mix temperature.
Application
1. Apply using a steel trowel. Surfaces must be frost free and
above 40°F (4°C) and below 100°F (38°C) within 24 hours of
application and 48 hours thereafter. Do not apply in direct
sunlight on hot, windy days, or when rain is forecasted within
24 hours.
2. To reduce shrinkage and cracking, build up in layers of ½ in.
(13 mm). Additional layers can be applied after 24 hours.
Vinyl Cement Patch is not intended for use as a
resurfacer.
3. Clean the surface of the trowel often with water and use a
“light touch” when finishing the surface. Do not over trowel. If
a textured finish is desired, brush in one direction with a soft-
bristled brush or broom while patch is still soft.
4. Protect the surface from use until patch is completely hard
and set. On average, supports foot traffic in 1 day, wheeled
traffic in 3 days depending upon humidity and temperatures.
Curing
Do not wet the surface before the materials has reached final
set. Maintain a minimum of 40⁰F (4⁰C) for 48 hours after
application. Product should be air-cured unless hot and/or
drying winds or low humidity are present. Under such
conditions, damp cure by covering the surface with wet burlap
or towel overnight to retain moisture or lightly fog spray. Note,
color may be affected where covering comes in contact with the
Vinyl Cement Patch. Remove covering and allow to air cure.
Repair can be painted with most paints once cured for a
1. PRODUCT NAME
Akona
®
Vinyl Cement Patch
2. MANUFACTURER
Akona
Manufacturing, LLC
A TCC Materials Company
2025 Centre Pointe Blvd., Suite 300
Mendota Heights, MN 55120 USA
Phone: 1.651.688.9116
Web: tccmaterials.com
3. PRODUCT DESCRIPTION
Akona Vinyl Cement Patch is ideally suited for repairing
concrete surfaces with minor imperfections, for example,
steps, sidewalks, driveways, patios, curbs, walls, and floors.
This product contains unique polymers to give it a higher bond
strength than that of conventional concrete. Designed for
applications from featheredge to ½ in. (13 mm) per application.
When resurfacing large areas, use Akona Polymer-Modified
Concrete Resurfacer.
Features and Benefits
• Superior bond
• Polymer-modified
• Trowelable to feather edge
• Excellent durability, interior or exterior
• Just add water, mix, and use
When/Where to Use
• Interior and exterior minor repairs
• Steps, sidewalks, patios, slabs, and driveways
• Walls or floors
4. TECHNICAL DATA
Greater than: > Greater than or equal to: ≥ Less than: < Less than or equal to: ≤
Note: Test results obtained under controlled laboratory conditions at 72°F (22°C) and
50% relative humidity. Tested using 6 pt. (2.8 L) water per 40 lb. (18 kg) bag.
Reasonable variations can occur due to atmospheric and job site conditions.
Available Sizes
• 10 lb. (4.5 kg) bag (BOM # 102633)
• 25 lb. (11 kg) bag (BOM # 102634)
• 40 lb. (18 kg) bag (BOM # 104452)
Coverage
1 sq. ft. per lb. at ⅛ in. thickness (0.09m2 per 0.45 kg at 3 mm)
5. INSTALLATION
Preparation
Read all directions before starting work. Proper surface
preparation is crucial to achieving a successful application.
VINYL CEMENT PATCH
Polymer-modified, high-strength mortar for minor concrete surface repairs
Approximate Water Requirements
10 lb. bag
1½ pints (0.7 L) of water
Do not exceed 1.5 pt. (0.7 L )
25 lb. bag
3¾ pints (1.8 L) of water
Do not exceed 3.75 pt. (1.8 L)
40 lb. bag
6 pints (2.8 L) of water
Do not exceed 6 pt. (2.8 L)
Typical Values • Akona Vinyl Cement Patch
Initial Set Time Approximately 30 minutes
Final Set Time Approximately 60 minutes
Compressive Strength ASTM C109 (air dry)
24 hours > 2,000 psi (13.8 MPa)
3 days > 4,000 psi (27.5 MPa)
28 days > 5,000 psi (34.4 MPa)