Installation Instructions

8
Gertraudenstraße 10-12, 10178 Berlin
Email: info@aisight.de
Phone: +49 (0) 30 40363399 V1.0
8
3. Service and installation
instructions
In order to successfully install Aion and directly read the data on the AiSight dashboard
three steps are needed:
1. Mounting: Mount Aion on the desired machinery
2. Powering: Connect Aion to power
3. Connecting: Provision the sensor to wifi
4. Operating. Read data from AiSight Dashboard
The steps that MUST be performed by qualified personnel are 1. Mounting
and 2. Powering.
3.1. Mounting
The Aion is a three axial vibration and geomagnetic sensor. The axes for both
measurements are configured as shown in Figure 4.1. The “x” axis is aligned with the logo,
while the “y” is aligned with the M8 connector. The “z” axis covers the resulting dimension,
perpendicular to the body of the sensor. The Aion can be installed on Motors, Pumps or
Gearboxes through the magnet on its back.
Figure 4.1 - Sensor orientation
X
Z
Y
!