Installation Instructions
12
Gertraudenstraße 10-12, 10178 Berlin
Email: info@aisight.de
Phone: +49 (0) 30 40363399 V1.0
12
or fixed machines parts are present, the cable can be attached to them by using cable ties. If
there is no support or existing cables, cable tie holders can be installed in flat surfaces.
Ensure the surface is clean and degreased before installing adhesive cable tie holders.
Once the cable is close to the sensor mounting point, some safety precautions must be taken
to provide enough distance from any moving parts (i.e. shafts, belts). Since the connector
must be screwed to the sensor, some slack must be ensured. The connector and cable cannot
introduce any traction on the sensor, since this may compromise the sensor reading and
functionality.
When installing the cable in moving parts, like injection molding tools, the equipment must
be placed initially in the position in
The suggested external installation procedure with adhesive cable tie holders is described
below.
1) Observe the complete path of the cable before starting the installation
2) Draw lines or use a level if necessary to mark the support points
3) Clean all the surfaces with industrial surface cleaners
4) Install the cable tie holders
5) Lay the cable and install all the cable ties partially
6) Ensure some cable slack close to the sensor mounting location
7) Finish all cable ties and cut the excess edges
8) Connect the first end to the 24Vdc supply
After the cable is securely installed, the M8 connector must be plugged into the sensor.
9) Verify the polarity of both parts and align them
10) Push (without turning) the connector until it reaches the limit
11) Turn the connector in clockwise direction until a secure connection is achieved
Once the power is on, the sensor should indicate visually on the display LED the status of
the connection. The white light will indicate that the sensor is on. The light should shortly
change to a blue color, which will indicate that the sensor ready is ready for the next step.