User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 OneRAN Pilot Station Safety and Compliance Information
- 3 OneRAN Pilot Station System Introduction
- 4 OneRAN Pilot Station Components
- 5 OneRAN Pilot Station Interface Cabling
- 6 OneRAN Pilot Station Frequency Setting Procedures
- 7 OneRAN Pilot Station Installation Procedures
- 7.1 Installation Verification
- 7.2 OneRAN Pilot Station Install Procedures
- 7.3 System Test
- 7.3.1 PC to OneRAN Pilot Station cable
- 7.3.2 System Certification Tests
- 7.3.2.1 Test Case #1 - Image/PLD loading
- 7.3.2.2 Test Case #2 – System Check
- 7.3.2.3 Test Case #3 – Tx check
- 7.3.2.4 Test Case #4 – Output power
- 7.3.2.5 Test Case #5 – GPS Check
- 7.3.2.6 Test Case #6 – BTS Alarm Check
- 7.3.2.7 Test Case #7 – System Reset
- 7.3.2.8 Test Case #8 – PN Check
- 7.3.2.9 Test Case #9 – System Interface Check
- 7.3.3 Operation Tests
- 7.3.4 Operator Specific Tests
- 7.4 Site Clean up and Customer Signoff
- 7.5 Required Tools and Supplies
- 7.6 Troubleshooting Procedures
- 8 Appendix A - Acronyms
- 9 Appendix B - Site preparation checklist
- 10 Appendix C - Installation Checklist
- 11 Appendix D - Customer Certification Document
OneRAN Pilot Station System Installation Manual
__________________________________________________________________________________________________________________
___________________________________________________________________________________________________________________
AirWalk Proprietary and Confidential Page 45 of 49 5/6/2008
10 Appendix C - Installation Checklist
OneRAN Pilot Station Site Installation Check List for: {Customer Name}
Address Installer Name (s) Customer Contact (s)
{OneRAN Pilot Station Installation Address}
ITEM
#
Description
Install
Manual
Section
Date
Complete
Time
Customer
Contact
Initials
Installer
Initials
1 Verify Customer Contact & Equipment location 9.1.1
2 Contact Customer 9.1.1.1
3 Locate OneRAN Pilot Station Equipment 9.1.1.2
4 Locate and verify Floor Space 9.1.1.3
5 Uncrate and arrange for packing material disposal 9.1.2
6 Verify location of all distribution points (main and intermediate) 9.1.3
7 Power Check 9.1.3.1
8 Power Location 9.1.3.1.1
9 Verify Connector 9.1.3.1.2
10 Voltage 9.1.3.1.3
11 Amps 9.1.3.1.4
12 LAN Facilities check 9.1.3.1.5
13 Location 9.1.5.1.5
14 Verify IP Address 9.1.3.1.5
15 Verify Connector 9.1.3.1.5
16 Ping IP Address 9.1.3.1.5