User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 OneRAN Pilot Station Safety and Compliance Information
- 3 OneRAN Pilot Station System Introduction
- 4 OneRAN Pilot Station Components
- 5 OneRAN Pilot Station Interface Cabling
- 6 OneRAN Pilot Station Frequency Setting Procedures
- 7 OneRAN Pilot Station Installation Procedures
- 7.1 Installation Verification
- 7.2 OneRAN Pilot Station Install Procedures
- 7.3 System Test
- 7.3.1 PC to OneRAN Pilot Station cable
- 7.3.2 System Certification Tests
- 7.3.2.1 Test Case #1 - Image/PLD loading
- 7.3.2.2 Test Case #2 – System Check
- 7.3.2.3 Test Case #3 – Tx check
- 7.3.2.4 Test Case #4 – Output power
- 7.3.2.5 Test Case #5 – GPS Check
- 7.3.2.6 Test Case #6 – BTS Alarm Check
- 7.3.2.7 Test Case #7 – System Reset
- 7.3.2.8 Test Case #8 – PN Check
- 7.3.2.9 Test Case #9 – System Interface Check
- 7.3.3 Operation Tests
- 7.3.4 Operator Specific Tests
- 7.4 Site Clean up and Customer Signoff
- 7.5 Required Tools and Supplies
- 7.6 Troubleshooting Procedures
- 8 Appendix A - Acronyms
- 9 Appendix B - Site preparation checklist
- 10 Appendix C - Installation Checklist
- 11 Appendix D - Customer Certification Document
OneRAN Pilot Station System Installation Manual
____________________________________________________________________________
_____________________________________________________________________________
AirWalk Proprietary and Confidential Page 28 of 49
7.2.2 External System Connections
5
To install new internal connections refer to the Section and Figures in the following Table
for proper cable installation.
Section Description Reference
3
6.1 External Diversity Antenna System Figure 6-2
6.2 Electrical Power Cable
Figure 6-3
Use AC power
cables supplied
with unit.
6.3 External BSC & BTS Ethernet Cable Figure 6-4
6.4 External GPS Antenna Cable Figure 6-5
Table 7-1 - External System Cable Reference
7.2.3 Connect Power to Cabinet
Connect -48VDC to DC distribution panel (if applicable).
Connect 120VAC or 240VAC to Rack AC distribution panel (if applicable).
7.2.4 Connect Communications Facilities
Connect LAN Facilities to BSC
Connect LAN Facilities to BTS.
7.2.5 Power-up procedure
67
7.2.5.1 Power-up Main cabinet
Make sure all appropriate LED’s are illuminated.
7.2.5.2 Complete any Configuration options.
a) Configure the OneRAN Pilot Station.
i) Outgoing and incoming channels.
5
WARNING: Make sure all system power supplies are turned off. All
breakers/Fuses are pulled on all main and intermediate panels. Then proceed with
the Installation.
6
Note: Once all connections are made, make sure to: Reset/install all breakers/fuses for
all main and intermediate breaker/fuse box(s). Then proceed with the Installation.
7
Make sure all added cabling is tie-wrapped correctly