10.2.6 Power-up procedure
67
10.2.6.1 Power-up Main cabinet.
Make sure all appropriate LED’s are illuminated.
10.2.6.2 Complete any Configuration options.
a) Configure the AW-SERIES IP-RAN.
i) Outgoing and incoming channels.
10.3 System Test
This section contains the system tests that should be completed to determine if AW-
SERIES IP-RAN is operational.
10.3.1 PC to AW 96 cable
A special cable is required to run the required certification tests.
Connect a PC with the subject cable to run tests
BTS
P1
CONNECTOR DB9
5
9
4
8
3
7
2
6
1
RJ1
RJ-45
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
BTS
P1
CONNECTOR DB9
5
9
4
8
3
7
2
6
1
RJ1
RJ-45
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
Pin Configuration
DB9 RJ-45
(Computer) (BTS)
5 3
3 5
2 7
Figure 7-1 - PC to AW 96 Cable Specifiaction
6
Note: Once all connections are made, make sure to: Reset/install all breakers/fuses for
all main and intermediate breaker/fuse box(s). Then proceed with the Installation.
7
Make sure all added cabling is tie-wrapped correctly