10.1.3.1.3 Voltage
1) Using a power meter check for correct voltage.
a) –48VDC range is 40VDC to 57VDC (if required).
b) 120 VAC range is 90 VAC to 132 VAC (if required).
c) 240 VAC range is 180 VAC to 264 VAC (if required).
10.1.3.1.4 Amps
1) Check cables to determine if they will handle required Amps.
a) –48VDC should be able to support 27.9 Amps.
b) 120 VAC should support 15 Amps, 240 VAC should support 7.5 Amps
10.1.3.1.5 LAN Facilities check.
1) Location – Locate the customer provided LAN connections.
2) Verify IP Address (Site Prep Checklist Appendix B).
3) Verify Connector is an RJ45 (if not contact customer).
4) Connect Laptop and Ping IP Address.
5) Prepare a site IP addressable device diagram showing the IP address for each
device at the base station site. This diagram is essential for any needed
troubleshooting activities.
6) Post the diagram at the site and return a copy to the customer’s maintenance center
and a copy to the AirWalk customer service center:
AirWalk Customer Service Centre
1830 North Greenville Ave.,
Richardson, Texas 75081
10.2 AW-SERIES IP-RAN Install Procedures
10.2.1 Install AW-SERIES IP-RAN Cabinet
Move AW-SERIES IP-RAN to location.
Secure AW-SERIES IP-RAN in designated location
(Bolt down or Secure Wheels if provided).
10.2.2 Verify All Internal System Connections
To verify all internal connections refer to the Section and Figures in the following Table
for proper cable installation.