User's Manual
AirSynergy 2000 Installation Guide
Page 48 Commercial in Confidence UGD-D01001 Rev A
Figure 47 - Standard power (100W) PSU
The PSU module can be screwed into position using the self-tapping screws provided (4 places).
Figure 48 - attaching PSU
Note: For USA deployments an alternative PSU and enclosure arrangement is
required – Refer to Appendix E.
Figure 49 - PSU for USA deployment
Caution: Safety - Disconnection of AC supply.
When AirSynergy is connected directly to building or lamp post wiring a
suitably rated and easily accessible disconnect device shall be
incorporated external to the equipment.
When AirSynergy is connected to the AC power supply using a plug and
socket, the socket-outlet shall be installed near the equipment and shall
be easily accessible.