User's Manual
Table Of Contents
- 1 About this Guide
- 2 Introduction
- 3 Getting Started
- 4 Verify Prerequisites
- 5 Install MacroMAXe
- 6 Connect and Manage Cables
- 7 Set Power System
- 8 Appendix A
- 9 Appendix C – Glossary of Terms
- 10 Appendix D – Installation Checklist
- 11 Appendix E
MacroMAXe Installation Guide
Page 50 Commercial in Confidence UGD-D00181 Rev E
10 Appendix D – Installation Checklist
The Checklist below gives the high-level steps in the Workflow for this procedure. Detach or print this
page to use as a job-aid for completing the actions this procedure requires.
Procedure Actions
Outcome
1. Verify Prerequisites Verify safety
requirements
Verify installation
requirements
All requirements are in
place for a successful
commissioning of
MacroMAXe.
2. Install MacroMAXe Pole mount configuration
Wall mount configuration
Install MacroMAXe
antennas
3. Connect and manage
cables
Assemble Ethernet
connector or
Disassemble Ethernet
connector, then
Assemble LTW Ethernet
connector
4. Set power system Power input
Power output
Table10–ChecklistforProcedure