10 Appendix D – Installation Checklist
The Checklist below gives the high-level steps in the Workflow for this procedure. Detach or print this
page to use as a job-aid for completing the actions this procedure requires.
Table 19 - Checklist for Procedure
Procedure
Actions
Outcome
1. Verify Prerequisites
Verify safety
requirements
Verify installation
requirements
All requirements are in
place for a successful
commissioning of Air4G.
2. Install Air4G
Pole mount configuration
Wall mount configuration
Install Air4G antennas
3. Connect and manage
cables
Assemble Ethernet
connector or
Disassemble Ethernet
connector, then
Assemble LTW Ethernet
connector
4. Set power system
Power input