User's Manual

Air4G-W24 Installation Guide
Page 43 Commercial in Confidence UGD-D00181 Rev G
5.3 Air4G-W24 Connections
The following diagram displays the connections on the bottom side of the Air4G-W24.
The base station requires a secure ground connection. The cable should also be grounded to the
tower which is grounded at the tower base. A grounding screw fitted with a flat washer and lock
washer is provided on the bottom of the chassis clearly marked with the universal ground symbol
as shown below.
Figure 22 - Air4G-W24 connections (bottom)
Note: Previous versions had 3 RJ45 (Ethernet) connections.
5.3.1 LED Display
The LED‟s are a visual display to indicate basic BS status, see LED Display below for a
description of the LED display.
5.4 Install Air4G-W24 Antennas
Use this procedure to install a linear dual slant antenna for the Air4G-W24 in the mast mount
configuration.