11 Appendix D Installation Checklist
The Checklist below gives the high-level steps in the Workflow for this procedure. Detach or print
this page to use as a job-aid for completing the actions this procedure requires.
Table 20 - Checklist for Procedure
Procedure
Actions
Outcome
1. Verify Prerequisites
Verify safety
requirements
Verify installation
requirements
All requirements are in
place for a successful
commissioning of Air4G-
W24.
2. Install Air4G-W24
Pole mount configuration
Wall mount configuration
Install Air4G-W24
antennas
3. Connect and manage
cables
Assemble Ethernet
connector or
Disassemble Ethernet
connector, then
Assemble LTW Ethernet
connector
4. Set power system
Power input
Power output