User Manual
Table Of Contents
- Copyright
- Table of Contents
- Summary of Figures
- Summary of Tables
- Warnings and Cautions
- DECLARATION OF CONFORMITY
- FCC Notice
- Maximum Output TX Power
- 1 About this Guide
- 2 Introduction
- 3 Getting Started
- 4 Verify Prerequisites
- 5 Install Air4G
- 5.1 Pole mount configuration
- 5.2 Wall mount configuration
- 5.3 Surge Protector Mounting
- 5.4 Air4G Connections
- 5.5 Install Air4G Antennas
- 5.6 Optional Mounting Antenna on Air4G
- 5.7 Cavity Filter Installation
- 5.8 External Duplexer Installation
- 5.9 Antenna Connection
- 5.10 GPS Antenna Assembly
- 5.11 LED Display
- 5.12 Install Junction Box (Optional)
- 6 Connect and Manage Cables
- 7 Set Power System
- 8 Initial WEB Configuration
- 9 Appendix A
- 10 Appendix C – Glossary of Terms
- 11 Appendix D – Installation Checklist
- 12 Appendix E
Air4G Installation Guide
Page 37 Commercial in Confidence UGD-D00229 Rev B
Figure 14 - pole bracket wrap
2. Align and position each of the 2 pole clamp brackets at the heights required to attach the
Air4G (with the threaded holes facing up). Adjust the upper bracket and tighten in place.
Adjust the lower bracket and hand-tighten.
Figure 15 - position brackets on pole
Note: Remove assembled screws (2) and washers (4) for later use.
Figure 16 - spacing the brackets
3. Lift the rear wall mount and place the screws through the head clearance holes and
position the unit so that the top mounting holes retain the unit.
Caution: These units weigh over 17 kg take care when lifting.
4. Screw the bottom two the M8 screws and washers into the two standoff fittings at the
bottom bracket.
5. Check and tighten all fixing screws.