User's Manual

Table Of Contents
Mounting the ProST
39
2. Drill holes for each hole that you marked in the step above.
3. Insert wall anchors (supplied) into each of the drilled holes.
4. Insert the 9-inch screws (supplied) into the wall anchors. Ensure at least 2 mm of the screw
is exposed to allow insertion into the SDA-4S mounting holes.
5. Hold the SDA-4S with both hands, and align the entrance to the two mounting hooks with
the screws. Slide the screws into the mounting hooks, by lowering the SDA-4S onto the
screws.
Note: For safety, use both mounting hooks to mount the unit.
Note: The SDA-4S is supplied with a 1 meter AC power lead assembly. Ensure the unit
is mounted within 1 meter of the main power outlet.
Note: The maximum cable run between SDA-4S and ProST is 100 meters.