User's Manual

Table Of Contents
18
INSTALLATION PREREQUISITES
Before installing your ProST, read the following to ensure that:
No items are missing from the package
Minimum computer requirements are fulfilled
You have the required installation tools
Radio Site planning has been performed
Package Contents
Examine the ProST shipping container. If you notice any damage, or missing items as listed in the
Packing List, immediately notify the carrier that delivered the unit and contact a Airspan
representative.
The ProST kit should contain the following items:
ProST
DB15-to-RJ45 adapter for plugging into the ProST's 15-pin D-type port (with pins 7 & 8 not
connected), replaces previous adapter.
Wall-mounting kit:
o Mounting bracket
o 2 x M10 hex head screws
o 2 x M10 hex nuts
o 2 x M10 plain washers
o 2 x M10 spring lock washers
Note: The standard ProST kit does not include pole-mounting accessories. For pricing and
ordering of pole-mounting accessories, please contact your nearest Airspan dealer.
Note: The standard ProST kit does not include the SDA-1 Type II adapter. For pricing and
ordering of the SDA-1 Type II adapter, please contact your nearest Airspan dealer.
Minimum PC Requirements
Ensure that your computer provides an Ethernet interface such as a Network Interface Card (that
provides an RJ-45 port).
Warning: Only subscriber terminal equipment (e.g. computer modem port) that is
designed for full compliance with TNV-1 telecommunication network can be connected to the
SDA-1. Warranty of Airspan's equipment shall be made void if the SDA-1 is connected to a
computer that is not compliant with TNV-1.
Required Tools
The following tools are required to install the ProST unit:
Crimping tool for crimping CAT-5 cables to RJ-45 connectors
Cable stripping tool
Wall Mounting:
o drill bits
o 4 x wall anchors
o 4 x screws