User's Manual
Table Of Contents
- Hardware Installation Guide
- Contents
- About this Guide
- 1. Overview
- 2. Safety Guidelines
- 3. Package Contents
- 4. Required Tools
- 5. Radio Site Planning
- Part I: Base Station Installation
- Part II: CPE Installation - Subscriber Premises Radio (SPR)
- Part III: CPE Installation - Indoor Data Radio Indoor (IDR)
- A. Glossary
- B. Installing the BSPS
- B.1. Basic Design
- B.2. Physical Dimensions
- B.3. Electrical Site Requirements
- B.4. BSPS Cabinet Cabling
- B.5. Installation Summary
- B.6. BSPS Batteries
- B.7. Rectifiers
- B.8. Operating the System Controller
- B.9. Powering on BSPS
- B.10. Connecting BSPS Management Cables
- B.11. Cabinet Power Requirements
- B.12. Troubleshooting
- C. Cable Crimping
- D. Connector Pinouts for SPR with DB9
- E. Evaluating Link Quality
- F. Technical Specifications
- G. Third-Party External Antenna Specifications
- H. Declaration of Conformity

Contents Hardware Installation Guide
viii Airspan Networks Inc. 02030311-07
6.4. GPS..................................................................................................... 6-9
6.4.1. Ports ..................................................................................... 6-9
6.4.2. Physical Dimensions ............................................................ 6-9
6.5. BSPS................................................................................................. 6-10
7. Mounting the Devices .............................................................................. 7-1
7.1. Pole-Mounting the BSR....................................................................... 7-1
7.2. Rack Mounting the BSDU ................................................................... 7-9
7.3. Mounting the SDA-1/48V................................................................... 7-10
7.4. Mounting the BSPS (Optional) .......................................................... 7-11
8. Network Cabling ....................................................................................... 8-1
8.1. BSR Connected to an SDA ................................................................. 8-2
8.1.1. Connecting BSR to SDA....................................................... 8-2
8.1.2. Connecting SDA to Provider's Ethernet Network ................. 8-5
8.2. BSR Connected to a BSDU................................................................. 8-5
8.2.1. Connecting BSR to BSDU .................................................... 8-5
8.2.2. Connecting BSDU to 100BaseT Networks ........................... 8-8
8.2.3. Daisy-Chaining BSDUs ...................................................... 8-10
8.2.4. Connecting BSDU Synchronization Ports .......................... 8-12
8.2.5. Connecting BSDU to PC for SNMP Management.............. 8-15
8.3. BSR Connected to SDA-1/48V.......................................................... 8-18
8.3.1. Connecting BSR to SDA-1/48V .......................................... 8-18
8.3.2. Connecting SDA-1/48V to 10BaseT Network..................... 8-21
9. Serial Cabling ........................................................................................... 9-1
9.1. Serial Cabling BSR to a PC................................................................. 9-2
9.2. Serial Cabling BSDU to a PC .............................................................. 9-4
9.3. Serial Cabling BSPS to a BSDU ......................................................... 9-6