User's Manual
Table Of Contents
- Hardware Installation Guide
- Contents
- About this Guide
- 1. Overview
- 2. Safety Guidelines
- 3. Package Contents
- 4. Required Tools
- 5. Radio Site Planning
- Part I: Base Station Installation
- Part II: CPE Installation - Subscriber Premises Radio (SPR)
- Part III: CPE Installation - Indoor Data Radio Indoor (IDR)
- A. Glossary
- B. Installing the BSPS
- B.1. Basic Design
- B.2. Physical Dimensions
- B.3. Electrical Site Requirements
- B.4. BSPS Cabinet Cabling
- B.5. Installation Summary
- B.6. BSPS Batteries
- B.7. Rectifiers
- B.8. Operating the System Controller
- B.9. Powering on BSPS
- B.10. Connecting BSPS Management Cables
- B.11. Cabinet Power Requirements
- B.12. Troubleshooting
- C. Cable Crimping
- D. Connector Pinouts for SPR with DB9
- E. Evaluating Link Quality
- F. Technical Specifications
- G. Third-Party External Antenna Specifications
- H. Declaration of Conformity

Hardware Installation Guide Contents
02030311-07 Airspan Networks Inc. xiii
D. Connector Pinouts for SPR with DB9 Port ............................................D-1
E. Evaluating Link Quality............................................................................E-1
E.1. RSSI Levels ........................................................................................E-2
E.1.1. Measuring RSSI at SPR using WipConfig ...........................E-3
E.1.2. Measuring RSSI at BSR using WipManage.........................E-4
E.2. Carrier-to-Interference Ratio............................................................... E-5
E.2.1. Spectrum Analysis using WipConfig ....................................E-6
E.2.1.1. Accessing the Spectrum Analyzer.........................E-6
E.2.1.2. Setting up the Spectrum Analyzer .........................E-7
E.2.1.3. Starting the Spectrum Analyzer.............................E-8
E.2.1.4. Viewing Results ..................................................... E-8
E.3. Bit Error Rate (BER) ........................................................................... E-9
E.3.1. Measuring BER Using WipConfig ......................................E-10
E.3.2. Measuring BER Using WipManage.................................... E-11
E.4. Generating Traffic to Measure Throughput.......................................E-12
F. Technical Specifications ......................................................................... F-1
F.1. Base Station Equipment...................................................................... F-2
F.1.1. Base Station Radio (BSR).................................................... F-2
F.1.2. Point-to-Point Radio (PPR) .................................................. F-6
F.1.3. Base Station Distribution Unit (BSDU) ................................. F-7
F.1.4. SDA-1/48V ........................................................................... F-8
F.1.5. Base Station Power Supply (BSPS)..................................... F-9
F.1.6. GPS Antenna ..................................................................... F-12