User's Manual
AirHarmony-1000 Installation Guide
UGD-D01006 Airspan Commercial and Internal Use 53
B Checklist
During installation, review and perform all the steps on this checklist (in the given order). This
checklist is meant for the person who performs the AirHarmony-1000 installation. It includes the high–
level steps involved in the installation process.
Tip: To make sure you complete all the tasks, detach or print this checklist and use it as a job aid.
After performing, check off each task.
Procedure
Action
Check If Performed
Verify the prerequisites
Verify the site requirements.
☐
Verify the installation requirements.
☐
Verify the tool requirements.
☐
Verify the parts & kits required.
☐
AirHarmony-1000
installation
Install the mounting bracket.
☐
Install AC/DC converter on mounting bracket (if
required)
☐
Install AirHarmony-1000 on the mounting
bracket.
☐
Connect & manage
Cables
Connect to copper Ethernet (if applicable)
☐
Connect the fiber Ethernet (if applicable)
☐
Connect power system
Connect power
☐