User's Manual

AirHarmony-1000 Installation Guide
UGD-D01006 Airspan Commercial and Internal Use 53
B Checklist
During installation, review and perform all the steps on this checklist (in the given order). This
checklist is meant for the person who performs the AirHarmony-1000 installation. It includes the high
level steps involved in the installation process.
Tip: To make sure you complete all the tasks, detach or print this checklist and use it as a job aid.
After performing, check off each task.
Procedure
Action
Check If Performed
Verify the prerequisites
Verify the site requirements.
Verify the installation requirements.
Verify the tool requirements.
Verify the parts & kits required.
AirHarmony-1000
installation
Install the mounting bracket.
Install AC/DC converter on mounting bracket (if
required)
Install AirHarmony-1000 on the mounting
bracket.
Connect & manage
Cables
Connect to copper Ethernet (if applicable)
Connect the fiber Ethernet (if applicable)
Connect power system
Connect power