User Manual
AS4000 Survey Tool
605-0000-429
Issue 1.6. Date 1/9/99
Appendix E
Page 1 of 1
SURVEY CHECKLIST
Checklist
1. Set test modem in service at RLT
2. Do you have authenticated programming code?
3. Does proposed site meet site selection criteria?
4. Is site secure from safety viewpoint?
5. Ensure no obstructions (Power Cables, Over-hanging Eaves etc.)
6. Ensure Hard Hats are worn
7. Prepare tripod base
a) Fully lock legs ?
b) Engage feet retaining detents?
c) level tripod base
d) Locked feet and wheels
8. Preparation of Headload
a) Mount Headload securely on the mast
b) Attach drop cable to Headload?
c) Attach measuring tape to Headload?
d) Attach guys (if required)
9. Attachment of Headload and Mast to Tripod base
a) Fully inserted pin in the bush
b) Tighten mast mounting screw full tight?
10. Raising The Mast
a) . Is the air release screw closed?
b) Are mast sections locked?
c) When raised are all section screws tight?
e) is Mast correctly guyed?
11. Connecting Test Box
a) Is TX switch set to Disabled
b) Are telephone and drop cable attached to the Test Box
c) Is Test box switched on
d) Program CRU if not already programmed
12. Panning CRU
a) Is AGC panned to maximum
b) Enable TX switch
c) are Fade Margins within Limits If not do secondary pan.
13. Record Test Results
Take Polaroid picture for test results.
14. Dismantling Survey Tool
a) Disable TX
b) Switch off Test Box, disconnect and remove
c) Lower mast
d) Remove guys if fitted
e) Remove Mast