User Manual

AS4000 Survey Tool
605-0000-429
DLP-001
Issue 1.6. Date 1/9/99
Page 7 of 8
5. Guying the mast
If guy ropes have been attached to the mast in windy conditions (gusting or winds in excess of
24km/hr.) then secure the guys to stakes or other suitable fixing points. (e.g. poles)
6. Repositioning the mast
1. If the mast needs to be repositioned at anytime it will need to be fully retracted before
moving.
2. Proceed to Test Box Set Up Procedure DLP-002.
STOP. THIS PROCEDURE HAS BEEN COMPLETED.