User Manual

AS4000 Survey Tool
605-0000-429
Issue 1.6. Date 1/9/99
TAD-002
Page 2 of 2
Traffic cones
Weather Protection Tent
6. Preparation at Central Terminal (RLT)
1. Before using the survey tool ensure that the Central Terminal is functional. See CT I&C
manual 605-0000-432.
2. A modem should be set in service. Note the RF Frequency and modem number as these
details will be needed when programming the CRU. For details on steps required to place
modem in service see CT I&C manual 605-0000-432.
7. 4. Testing Process
The chart below details the stages of the testing process.
Choose probable
location for CRU
TAD-004
Set-up Tripod Base
DLP-001
Attach CRU Headload
to the Mast
DLP-001
Attach drop cable to
Headload
DLP-001
Extend mast to
required elevation
DLP-001
Attach test
equipment
DLP-002
Program CRU
DLP-003
Record test results
DLP-005
DismantleEquipment
DLP-006
Start
Stop
Pan CRU
DLP-004
Attach mast to
Tripod Base
DLP-001
Attach Measuring Tape
to the Headload
DLP-001
Enable TX
DLP-004
Secondary Pan
DLP-004
No link
Check Programming Code
DLP-004