User Manual

AS4000 Subscriber Terminal
Installation and Commissioning DLP 009
605-0000-436
Issue 1.5 Date: 18th October 1999
Page 3 of 10
Five Pair Drop Cable Termination at the PSU (Type 1 only)
1. Run cable end into the Junction Box. Estimate the length of end required for
termination of wires (allow 150mm of conductor for a maintenance re-termination
of wires) and cut cable to length.
2. Strip outer cable sheath using a knife or cable stripping tool to expose wires.
3. Strip and terminate the wires of the drop cable as shown in Figure 19.
Drop Cable
from CRU
JACK
SOCKET
1
2
3
4
5
6
12
11
10
9
8
7
DC Output
Cable from
AC PSU
To
STMON
1
2
3
4
5
6
7
8
9
10
11
12
System Data - Up
System Data - Down
Ground
V+; 24 Volts
Ground
0 volts
VF2A
Not Connected
VF1B
VF1A
Ground
Colour
Grey
Yellow
Red
Black
White
Blue
Orange
Violet
Screen
VF2B
Cable to
NTU
Sleeved outer braid
White
VF1A
VF1B
VF2A
VF2B
Terminal Function
5 pair NTUPSU
Figure 19. Junction Box 5 pair Termination ST-V2 (Type 1 PSU)
Six Pair Drop Cable Termination at the PSU (Type 1 only)
1. Run cable end into the Junction Box. Estimate the length of end required for
termination of wires (allow 150mm of conductor for a maintenance re-termination
of wires) and cut cable to length.
2. Strip outer cable sheath using a knife or cable stripping tool to expose wires.
3. Strip and terminate the wires of the drop cable as shown in Figure 20.