User Manual

AS4000 Subscriber Terminal
Installation and Commissioning DLP 019
605-0000-436
Issue 1.5 Date: 18th October 1999
Page 1 of 2 1988 Airspan Communications Corporation
FUNCTIONAL TESTS ST-I1 INSTALLATIONS
The following procedure will have to be completed before placing the
AS4000 system into service. All results must be entered on the
Commissioning Test Result Sheet, see DLP-019.
STEP PROCEDURE
Telephony Tests
1. Telephony tests can only be done after the CT has been connected to the ISDN
network switch.
2. Using Sitespan set up ISDN subscribers at the CT as outlined in the Sitespan user
guide 600-001-300, using the detailed level procedures (DLPs) DLP-038 to DLP
040.
3. Connect the ISDN test telephone to the RJ45 NTU.
4. Enable B Channel 1 by selecting the subscriber from the subscribers list and
checking the circuit activation in the Edit Subscriber Window in Sitespan .
5. Make an outgoing ISDN call, (ensure that no barring has been applied).
6. Arrange to receive an incoming call, (ensure that no barring has been applied).
7. Record the results on the test form.
8. Using Sitespan at the CT disable B Channel 1 by clicking on the circuit activation
box and enable B Channel 2 by selecting that channel from the Subscribers list in
Sitespan and checking the circuit activation in the Edit Subscriber Window.
9. Repeat steps 5,6, and 7.
10. Disconnect phone and restore the circuit activation to the desired state for both
channels.
STOP. THIS PROCEDURE HAS BEEN COMPLETED.