User Manual
AS4000 Subscriber Terminal
Installation and Commissioning
DLP 009
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 2 of 18
The installation kit consists of:
Part Number Description Quantity Use
454-0010-069 RJ11 Data cables 16 SIU to Krone
403-0010-251 Earth Brackets for SIUs 4 Fix SIU to enclosure
175-8000-003 M3 x 8mmPanhead Screw 5 (1 spare)
192-8000-006 M3 Coil washer 5 (1 spare)
Fix Earth Bracket to SIU
212-8000-049
90° F-type adapters
4 Fit to SIU F-type
175-8000-024 M8 x 40mm Dyna-bolt 4 Fix Plinth to floor
175-8000-025 M8 x 90mm Dyna-bolt 4 Fix enclosure to wall
175-8000-026 M8 x 70mm Coach Screw 4 Fix enclosure to wood
192-8000-014 M8 Plain Washer 4 Use with Coach Screw
TBA Universal Bush 4 Use with T10 Dropcable
STEP PROCEDURE
1. Securing Enclosure to Wall
1. Disconnect the power management ribbon from the cover of Battery and PSU
compartment. Remove the cover. The cover is secured by two ‘quarter turn’
fasteners at the side of the lid above and below the fuse holders. Disconnect the
Molex connectors to the PCB and the earth connection to the cover. Place cover
in a safe place.
2. Separate the Plinth from the Enclosure by removing the four M8 bolts from the
front and rear of the Enclosure
3. Remove the Blanking Plugs from the top two fixing holes in the rear of the
Enclosure.
4. Using the enclosure as a template, mark the first hole position.