User Manual
AS4000 Subscriber Terminal
Installation and Commissioning
DLP 013
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 1 of 2
FUNCTIONAL TESTS B SERIES INSTALLATIONS
ISDN tests can only be done after the CT has been connected to a network switch.
STEP PROCEDURE
This DLP in preparation
STOP. THIS PROCEDURE HAS BEEN COMPLETED.